_version_ |
1796858803446087680
|
author |
Abdullah, Arham
|
author_facet |
Abdullah, Arham
|
author_sort |
Abdullah, Arham
|
collection |
ePrints
|
first_indexed |
2024-03-05T19:17:49Z
|
format |
Conference or Workshop Item
|
id |
utm.eprints-45694
|
institution |
Universiti Teknologi Malaysia - ePrints
|
last_indexed |
2024-03-05T19:17:49Z
|
publishDate |
2011
|
record_format |
dspace
|
spelling |
utm.eprints-456942017-08-23T01:52:44Z http://eprints.utm.my/45694/ Concrete chimney demolition methods (case study: Perai TNB power station chimney) Abdullah, Arham 2011 Conference or Workshop Item PeerReviewed Abdullah, Arham (2011) Concrete chimney demolition methods (case study: Perai TNB power station chimney). In: 1st International Construction Business & Management Symposium 2011.
|
spellingShingle |
Abdullah, Arham
Concrete chimney demolition methods (case study: Perai TNB power station chimney)
|
title |
Concrete chimney demolition methods (case study: Perai TNB power station chimney)
|
title_full |
Concrete chimney demolition methods (case study: Perai TNB power station chimney)
|
title_fullStr |
Concrete chimney demolition methods (case study: Perai TNB power station chimney)
|
title_full_unstemmed |
Concrete chimney demolition methods (case study: Perai TNB power station chimney)
|
title_short |
Concrete chimney demolition methods (case study: Perai TNB power station chimney)
|
title_sort |
concrete chimney demolition methods case study perai tnb power station chimney
|
work_keys_str_mv |
AT abdullaharham concretechimneydemolitionmethodscasestudyperaitnbpowerstationchimney
|