Choice of alternative dispute resolutions in construction disputes

The adversarial natures of Construction Industry contribute construction disputes. This research aim to study Alternative Dispute Resolutions (ADRs) process and to propose the preferred ADRs that can minimise the time, cost and to preserve reputation and to propose enhancement criteria in current AD...

Full description

Bibliographic Details
Main Author: Abd. Halim, Fazzarieyyah
Format: Thesis
Language:English
Published: 2014
Subjects:
Online Access:http://eprints.utm.my/48940/25/FazzarieyyahAbdHalimMFKA2014.pdf
_version_ 1796859416705761280
author Abd. Halim, Fazzarieyyah
author_facet Abd. Halim, Fazzarieyyah
author_sort Abd. Halim, Fazzarieyyah
collection ePrints
description The adversarial natures of Construction Industry contribute construction disputes. This research aim to study Alternative Dispute Resolutions (ADRs) process and to propose the preferred ADRs that can minimise the time, cost and to preserve reputation and to propose enhancement criteria in current ADRs. Literature review was carried out and questionnaire was formulated and distributed to project participants in Johor Bahru. The data collected was analysed using Relative Important Index (RII). The analysis proved that from the null hypotheses variables tested, Negotiation matched 69% of the preferred resolution in the industry with some enhancement needed on this technique. The relationship and reputations rank the highest preference criteria with cost and duration fall on rank 10 and 11 respectively. Negotiation remains the most significant resolution method of construction disputes.
first_indexed 2024-03-05T19:26:51Z
format Thesis
id utm.eprints-48940
institution Universiti Teknologi Malaysia - ePrints
language English
last_indexed 2024-03-05T19:26:51Z
publishDate 2014
record_format dspace
spelling utm.eprints-489402020-07-08T03:16:33Z http://eprints.utm.my/48940/ Choice of alternative dispute resolutions in construction disputes Abd. Halim, Fazzarieyyah TA Engineering (General). Civil engineering (General) The adversarial natures of Construction Industry contribute construction disputes. This research aim to study Alternative Dispute Resolutions (ADRs) process and to propose the preferred ADRs that can minimise the time, cost and to preserve reputation and to propose enhancement criteria in current ADRs. Literature review was carried out and questionnaire was formulated and distributed to project participants in Johor Bahru. The data collected was analysed using Relative Important Index (RII). The analysis proved that from the null hypotheses variables tested, Negotiation matched 69% of the preferred resolution in the industry with some enhancement needed on this technique. The relationship and reputations rank the highest preference criteria with cost and duration fall on rank 10 and 11 respectively. Negotiation remains the most significant resolution method of construction disputes. 2014-08 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/48940/25/FazzarieyyahAbdHalimMFKA2014.pdf Abd. Halim, Fazzarieyyah (2014) Choice of alternative dispute resolutions in construction disputes. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:85110
spellingShingle TA Engineering (General). Civil engineering (General)
Abd. Halim, Fazzarieyyah
Choice of alternative dispute resolutions in construction disputes
title Choice of alternative dispute resolutions in construction disputes
title_full Choice of alternative dispute resolutions in construction disputes
title_fullStr Choice of alternative dispute resolutions in construction disputes
title_full_unstemmed Choice of alternative dispute resolutions in construction disputes
title_short Choice of alternative dispute resolutions in construction disputes
title_sort choice of alternative dispute resolutions in construction disputes
topic TA Engineering (General). Civil engineering (General)
url http://eprints.utm.my/48940/25/FazzarieyyahAbdHalimMFKA2014.pdf
work_keys_str_mv AT abdhalimfazzarieyyah choiceofalternativedisputeresolutionsinconstructiondisputes