Erodable dam breaching patterns due to overtopping

There have been numerous studies on dam breaching that have been carried out for a long time, but this area still needs further investigation. Dams which have failed due to breach mechanism have caused disastrous effects to the downstream area, such as loss of lives, property damages, economic and e...

Full description

Bibliographic Details
Main Author: Mat Lazin, Nor Ain
Format: Thesis
Language:English
Published: 2014
Subjects:
Online Access:http://eprints.utm.my/50676/25/NorAinMatLazinMFKA2014.pdf
_version_ 1796859489683505152
author Mat Lazin, Nor Ain
author_facet Mat Lazin, Nor Ain
author_sort Mat Lazin, Nor Ain
collection ePrints
description There have been numerous studies on dam breaching that have been carried out for a long time, but this area still needs further investigation. Dams which have failed due to breach mechanism have caused disastrous effects to the downstream area, such as loss of lives, property damages, economic and environmental damages. This is due to the complex process of breaching which involves many factors such as cohesiveness of the embankment material, the height of the dam and the slope of the embankment dam. Hence, the aim of this study was to investigate the breach patterns and breach grows when breaching takes place. Besides, this study is also focused on the breach hydrograph that is produced after the failure of embankment. The embankment dam of 0.1m was tested in 11m length and 0.6m width channel. The equation used to measure the outflow discharge was Q = 8/15 (Cd)(2g)0.5 tan (θ/2) (h)2.5. Different embankment parameters were considered, i.e. the embankment materials (coarse and medium sand), the inflow rates (Q1 = 0.6 m3/s, Q2 = 0.9 m3/s and Q3 = 1.2 m3/s) and the slope of the embankment dam (1V:2H and 1V:3H). Most of the embankment dam tested showed that vertical erosion occurred first until a certain point before lateral action took place. Higher inflow rate produced higher peak outflow and shorter peak time. Besides, higher inflow rate flushed away all the embankment materials towards downstream and formed a wedge shape at the end of the process, as observed from the side view. For different embankment slopes used, the flatter slopes prolonged the erosion process about 7.7 % and also reduced the peak outflow value of about 15.8 %. Different grain sizes of soil were also used in the tests and it proved that the smaller grain size of soil reduced the peak outflow value (6.5%) and prolonged the peak time about 13.3%. Process of dam breach is clearly influenced by the embankment material, the embankment slope and the inflow rate.
first_indexed 2024-03-05T19:27:56Z
format Thesis
id utm.eprints-50676
institution Universiti Teknologi Malaysia - ePrints
language English
last_indexed 2024-03-05T19:27:56Z
publishDate 2014
record_format dspace
spelling utm.eprints-506762020-07-08T03:48:53Z http://eprints.utm.my/50676/ Erodable dam breaching patterns due to overtopping Mat Lazin, Nor Ain TA Engineering (General). Civil engineering (General) There have been numerous studies on dam breaching that have been carried out for a long time, but this area still needs further investigation. Dams which have failed due to breach mechanism have caused disastrous effects to the downstream area, such as loss of lives, property damages, economic and environmental damages. This is due to the complex process of breaching which involves many factors such as cohesiveness of the embankment material, the height of the dam and the slope of the embankment dam. Hence, the aim of this study was to investigate the breach patterns and breach grows when breaching takes place. Besides, this study is also focused on the breach hydrograph that is produced after the failure of embankment. The embankment dam of 0.1m was tested in 11m length and 0.6m width channel. The equation used to measure the outflow discharge was Q = 8/15 (Cd)(2g)0.5 tan (θ/2) (h)2.5. Different embankment parameters were considered, i.e. the embankment materials (coarse and medium sand), the inflow rates (Q1 = 0.6 m3/s, Q2 = 0.9 m3/s and Q3 = 1.2 m3/s) and the slope of the embankment dam (1V:2H and 1V:3H). Most of the embankment dam tested showed that vertical erosion occurred first until a certain point before lateral action took place. Higher inflow rate produced higher peak outflow and shorter peak time. Besides, higher inflow rate flushed away all the embankment materials towards downstream and formed a wedge shape at the end of the process, as observed from the side view. For different embankment slopes used, the flatter slopes prolonged the erosion process about 7.7 % and also reduced the peak outflow value of about 15.8 %. Different grain sizes of soil were also used in the tests and it proved that the smaller grain size of soil reduced the peak outflow value (6.5%) and prolonged the peak time about 13.3%. Process of dam breach is clearly influenced by the embankment material, the embankment slope and the inflow rate. 2014-04 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/50676/25/NorAinMatLazinMFKA2014.pdf Mat Lazin, Nor Ain (2014) Erodable dam breaching patterns due to overtopping. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:84873
spellingShingle TA Engineering (General). Civil engineering (General)
Mat Lazin, Nor Ain
Erodable dam breaching patterns due to overtopping
title Erodable dam breaching patterns due to overtopping
title_full Erodable dam breaching patterns due to overtopping
title_fullStr Erodable dam breaching patterns due to overtopping
title_full_unstemmed Erodable dam breaching patterns due to overtopping
title_short Erodable dam breaching patterns due to overtopping
title_sort erodable dam breaching patterns due to overtopping
topic TA Engineering (General). Civil engineering (General)
url http://eprints.utm.my/50676/25/NorAinMatLazinMFKA2014.pdf
work_keys_str_mv AT matlazinnorain erodabledambreachingpatternsduetoovertopping