Industrialised building system formation scheduling for public buildings

The construction industry plays a major role in our country’s economic growth. However, the industry is not without weaknesses. The challenges often occur in the area of productivity, efficiency of work, quality of work and the delivery of work. The intensive use of foreign unskilled workers, low...

Full description

Bibliographic Details
Main Author: Tay, Allan Eng Mian
Format: Thesis
Language:English
Published: 2006
Subjects:
Online Access:http://eprints.utm.my/5142/1/AllanTayEngManMFKA2006.pdf
_version_ 1825909687326867456
author Tay, Allan Eng Mian
author_facet Tay, Allan Eng Mian
author_sort Tay, Allan Eng Mian
collection ePrints
description The construction industry plays a major role in our country’s economic growth. However, the industry is not without weaknesses. The challenges often occur in the area of productivity, efficiency of work, quality of work and the delivery of work. The intensive use of foreign unskilled workers, low technology equipments and out-of-dated construction methods, have eventually caused low productivity and inefficiency of work at construction site. IBS is one of the improved building systems that are being introduced in the construction industry, to achieve the target of faster completion with mass production of the building elements in places out of its final location in a building. A study was conducted to analyse ways to improve the implementation of IBS in terms of IBS scheduling at site for public buildings especially schools in our country. A comparison between the scheduling of both the conventional method and the proposed IBS method was carried out using Microsoft Project. The critical outputs in managing the scheduling of project such as time, labour productivity and task factor were clearly analysed. Types of lifting system were identified to ensure highest productivity and efficiency of work at site. Lastly, comparative check of proposed new conceptual school building utilising standard IBS components with Uniform Building By-Law 1984 were also carried out in this study.
first_indexed 2024-03-05T18:05:53Z
format Thesis
id utm.eprints-5142
institution Universiti Teknologi Malaysia - ePrints
language English
last_indexed 2024-03-05T18:05:53Z
publishDate 2006
record_format dspace
spelling utm.eprints-51422018-02-28T06:54:39Z http://eprints.utm.my/5142/ Industrialised building system formation scheduling for public buildings Tay, Allan Eng Mian TH Building construction TA Engineering (General). Civil engineering (General) The construction industry plays a major role in our country’s economic growth. However, the industry is not without weaknesses. The challenges often occur in the area of productivity, efficiency of work, quality of work and the delivery of work. The intensive use of foreign unskilled workers, low technology equipments and out-of-dated construction methods, have eventually caused low productivity and inefficiency of work at construction site. IBS is one of the improved building systems that are being introduced in the construction industry, to achieve the target of faster completion with mass production of the building elements in places out of its final location in a building. A study was conducted to analyse ways to improve the implementation of IBS in terms of IBS scheduling at site for public buildings especially schools in our country. A comparison between the scheduling of both the conventional method and the proposed IBS method was carried out using Microsoft Project. The critical outputs in managing the scheduling of project such as time, labour productivity and task factor were clearly analysed. Types of lifting system were identified to ensure highest productivity and efficiency of work at site. Lastly, comparative check of proposed new conceptual school building utilising standard IBS components with Uniform Building By-Law 1984 were also carried out in this study. 2006-04 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/5142/1/AllanTayEngManMFKA2006.pdf Tay, Allan Eng Mian (2006) Industrialised building system formation scheduling for public buildings. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
spellingShingle TH Building construction
TA Engineering (General). Civil engineering (General)
Tay, Allan Eng Mian
Industrialised building system formation scheduling for public buildings
title Industrialised building system formation scheduling for public buildings
title_full Industrialised building system formation scheduling for public buildings
title_fullStr Industrialised building system formation scheduling for public buildings
title_full_unstemmed Industrialised building system formation scheduling for public buildings
title_short Industrialised building system formation scheduling for public buildings
title_sort industrialised building system formation scheduling for public buildings
topic TH Building construction
TA Engineering (General). Civil engineering (General)
url http://eprints.utm.my/5142/1/AllanTayEngManMFKA2006.pdf
work_keys_str_mv AT tayallanengmian industrialisedbuildingsystemformationschedulingforpublicbuildings