Process modification of Total Site Heat Integration profile for capital cost reduction
The Total Site Profile (TSP) can be a powerful tool to evaluate the potential for further Heat Integration improvement for a Total Site (TS). A systematic Total Site Heat Integration (TSHI) methodology to target decreasing the capital cost of heat transfer units at Total Sites has been developed. Th...
Main Authors: | , , , |
---|---|
Format: | Article |
Published: |
Elsevier Limited
2015
|
Subjects: |
_version_ | 1796860079817883648 |
---|---|
author | Kew, Hong Chew Klemes, Jiri Jaromir Wan Alwi, Sharifah Rafidah Manan, Zainuddin Abdul |
author_facet | Kew, Hong Chew Klemes, Jiri Jaromir Wan Alwi, Sharifah Rafidah Manan, Zainuddin Abdul |
author_sort | Kew, Hong Chew |
collection | ePrints |
description | The Total Site Profile (TSP) can be a powerful tool to evaluate the potential for further Heat Integration improvement for a Total Site (TS). A systematic Total Site Heat Integration (TSHI) methodology to target decreasing the capital cost of heat transfer units at Total Sites has been developed. The methodology includes a set heuristics that have been developed to identify and prioritise the strategic process changes to apply, as a result of changes in the TSP shape. The TSP and expanded Total Site Problem TableAlgorithm (TS-PTA) can provide useful insights for the plant designers to identify "where", in terms of which temperature interval, and which streams within the entire TS to focus the process modification efforts. The keep hot stream hot (KHSH) and keep cold stream cold (KCSC) principles can be applied to favourably change the TSP shape to provide a larger temperature driving force to further reduce the HTA and capital costs. In one of the case study, the application of KHSH and KCSC on TSP increases the temperature driving force between the medium pressure steam utility and process resulting in a reduction of 3,827m2 heat transfer area (HTA) and a saving of 10% in heat exchangers cost. The proposed changes to the selected streams should be assessed from feasibility, practicality and economic perspectives. The selected and potentially acceptable process modification options can be conveniently merged with potential retrofit project (e.g. to increase plant capacity) considered for the Total Site. |
first_indexed | 2024-03-05T19:36:37Z |
format | Article |
id | utm.eprints-55081 |
institution | Universiti Teknologi Malaysia - ePrints |
last_indexed | 2024-03-05T19:36:37Z |
publishDate | 2015 |
publisher | Elsevier Limited |
record_format | dspace |
spelling | utm.eprints-550812017-08-01T07:42:43Z http://eprints.utm.my/55081/ Process modification of Total Site Heat Integration profile for capital cost reduction Kew, Hong Chew Klemes, Jiri Jaromir Wan Alwi, Sharifah Rafidah Manan, Zainuddin Abdul TP Chemical technology The Total Site Profile (TSP) can be a powerful tool to evaluate the potential for further Heat Integration improvement for a Total Site (TS). A systematic Total Site Heat Integration (TSHI) methodology to target decreasing the capital cost of heat transfer units at Total Sites has been developed. The methodology includes a set heuristics that have been developed to identify and prioritise the strategic process changes to apply, as a result of changes in the TSP shape. The TSP and expanded Total Site Problem TableAlgorithm (TS-PTA) can provide useful insights for the plant designers to identify "where", in terms of which temperature interval, and which streams within the entire TS to focus the process modification efforts. The keep hot stream hot (KHSH) and keep cold stream cold (KCSC) principles can be applied to favourably change the TSP shape to provide a larger temperature driving force to further reduce the HTA and capital costs. In one of the case study, the application of KHSH and KCSC on TSP increases the temperature driving force between the medium pressure steam utility and process resulting in a reduction of 3,827m2 heat transfer area (HTA) and a saving of 10% in heat exchangers cost. The proposed changes to the selected streams should be assessed from feasibility, practicality and economic perspectives. The selected and potentially acceptable process modification options can be conveniently merged with potential retrofit project (e.g. to increase plant capacity) considered for the Total Site. Elsevier Limited 2015-10-05 Article PeerReviewed Kew, Hong Chew and Klemes, Jiri Jaromir and Wan Alwi, Sharifah Rafidah and Manan, Zainuddin Abdul (2015) Process modification of Total Site Heat Integration profile for capital cost reduction. Applied Thermal Engineering, 89 . pp. 1023-1032. ISSN 1359-4311 http://dx.doi.org/10.1016/j.applthermaleng.2015.02.064 DOI:10.1016/j.applthermaleng.2015.02.064 |
spellingShingle | TP Chemical technology Kew, Hong Chew Klemes, Jiri Jaromir Wan Alwi, Sharifah Rafidah Manan, Zainuddin Abdul Process modification of Total Site Heat Integration profile for capital cost reduction |
title | Process modification of Total Site Heat Integration profile for capital cost reduction |
title_full | Process modification of Total Site Heat Integration profile for capital cost reduction |
title_fullStr | Process modification of Total Site Heat Integration profile for capital cost reduction |
title_full_unstemmed | Process modification of Total Site Heat Integration profile for capital cost reduction |
title_short | Process modification of Total Site Heat Integration profile for capital cost reduction |
title_sort | process modification of total site heat integration profile for capital cost reduction |
topic | TP Chemical technology |
work_keys_str_mv | AT kewhongchew processmodificationoftotalsiteheatintegrationprofileforcapitalcostreduction AT klemesjirijaromir processmodificationoftotalsiteheatintegrationprofileforcapitalcostreduction AT wanalwisharifahrafidah processmodificationoftotalsiteheatintegrationprofileforcapitalcostreduction AT mananzainuddinabdul processmodificationoftotalsiteheatintegrationprofileforcapitalcostreduction |