Causes of variation order in building and civil engineering projectsin Nigeria

Variation does not only affect labour productivity but also leads to the dispute, time and cost overrun. Consequently, it affects projects performance. It is, therefore, imperative for construction professionals to eliminate unnecessary additional cost from a project so as to optimize the client’s b...

Full description

Bibliographic Details
Main Authors: Muhammad, Nasiru Zakari, Keyvanfar, Ali, Abd. Majid, Muhd. Zaimi, Shafaghat, Arezou, Magana, Aliyu Muhammad, Dankaka, Nafisa Sabiu
Format: Article
Language:English
Published: Penerbit UTM Press 2015
Subjects:
Online Access:http://eprints.utm.my/58008/1/MuhdZaimiMajid2015_CausesofVariationOrderinBuilding.pdf
_version_ 1796860423325089792
author Muhammad, Nasiru Zakari
Keyvanfar, Ali
Abd. Majid, Muhd. Zaimi
Shafaghat, Arezou
Magana, Aliyu Muhammad
Dankaka, Nafisa Sabiu
author_facet Muhammad, Nasiru Zakari
Keyvanfar, Ali
Abd. Majid, Muhd. Zaimi
Shafaghat, Arezou
Magana, Aliyu Muhammad
Dankaka, Nafisa Sabiu
author_sort Muhammad, Nasiru Zakari
collection ePrints
description Variation does not only affect labour productivity but also leads to the dispute, time and cost overrun. Consequently, it affects projects performance. It is, therefore, imperative for construction professionals to eliminate unnecessary additional cost from a project so as to optimize the client’s benefit against input resources. This paper identifies and examines the most significant causes that contribute to the variation orders. Also, Nigerian construction industry is used as a case study. Variation orders causing factors were assessed. Questionnaires were administered to clients, consultants and contractors to elicit information regarding variation causing factors. These factors were analyzed using frequency aggregation, mean score method and subsequently ranked according to their severity. The result revealed three most significant causes of variation which are: ‘Change of plan’’ with the highest frequency of 58% then followed by ‘‘Conflicting contract documents (50%). The next most frequent causing factors were the “substitution of materials” and “change in design” each with frequency of 43%. The least causing factor of variation was the “error and omission in design” with the frequency of 10%. Also differing site condition, new government regulation, weather condition were identified as other cause of variation with the frequency of 27%, 29% and 10% respectively. It has also shown that most critical source of variation order is the client due to change of plan then followed by consultant due to conflicting contract document.
first_indexed 2024-03-05T19:41:08Z
format Article
id utm.eprints-58008
institution Universiti Teknologi Malaysia - ePrints
language English
last_indexed 2024-03-05T19:41:08Z
publishDate 2015
publisher Penerbit UTM Press
record_format dspace
spelling utm.eprints-580082021-11-03T07:17:37Z http://eprints.utm.my/58008/ Causes of variation order in building and civil engineering projectsin Nigeria Muhammad, Nasiru Zakari Keyvanfar, Ali Abd. Majid, Muhd. Zaimi Shafaghat, Arezou Magana, Aliyu Muhammad Dankaka, Nafisa Sabiu TA Engineering (General). Civil engineering (General) Variation does not only affect labour productivity but also leads to the dispute, time and cost overrun. Consequently, it affects projects performance. It is, therefore, imperative for construction professionals to eliminate unnecessary additional cost from a project so as to optimize the client’s benefit against input resources. This paper identifies and examines the most significant causes that contribute to the variation orders. Also, Nigerian construction industry is used as a case study. Variation orders causing factors were assessed. Questionnaires were administered to clients, consultants and contractors to elicit information regarding variation causing factors. These factors were analyzed using frequency aggregation, mean score method and subsequently ranked according to their severity. The result revealed three most significant causes of variation which are: ‘Change of plan’’ with the highest frequency of 58% then followed by ‘‘Conflicting contract documents (50%). The next most frequent causing factors were the “substitution of materials” and “change in design” each with frequency of 43%. The least causing factor of variation was the “error and omission in design” with the frequency of 10%. Also differing site condition, new government regulation, weather condition were identified as other cause of variation with the frequency of 27%, 29% and 10% respectively. It has also shown that most critical source of variation order is the client due to change of plan then followed by consultant due to conflicting contract document. Penerbit UTM Press 2015 Article PeerReviewed application/pdf en http://eprints.utm.my/58008/1/MuhdZaimiMajid2015_CausesofVariationOrderinBuilding.pdf Muhammad, Nasiru Zakari and Keyvanfar, Ali and Abd. Majid, Muhd. Zaimi and Shafaghat, Arezou and Magana, Aliyu Muhammad and Dankaka, Nafisa Sabiu (2015) Causes of variation order in building and civil engineering projectsin Nigeria. Jurnal Teknologi, 77 (16). pp. 91-97. ISSN 0127-9696
spellingShingle TA Engineering (General). Civil engineering (General)
Muhammad, Nasiru Zakari
Keyvanfar, Ali
Abd. Majid, Muhd. Zaimi
Shafaghat, Arezou
Magana, Aliyu Muhammad
Dankaka, Nafisa Sabiu
Causes of variation order in building and civil engineering projectsin Nigeria
title Causes of variation order in building and civil engineering projectsin Nigeria
title_full Causes of variation order in building and civil engineering projectsin Nigeria
title_fullStr Causes of variation order in building and civil engineering projectsin Nigeria
title_full_unstemmed Causes of variation order in building and civil engineering projectsin Nigeria
title_short Causes of variation order in building and civil engineering projectsin Nigeria
title_sort causes of variation order in building and civil engineering projectsin nigeria
topic TA Engineering (General). Civil engineering (General)
url http://eprints.utm.my/58008/1/MuhdZaimiMajid2015_CausesofVariationOrderinBuilding.pdf
work_keys_str_mv AT muhammadnasiruzakari causesofvariationorderinbuildingandcivilengineeringprojectsinnigeria
AT keyvanfarali causesofvariationorderinbuildingandcivilengineeringprojectsinnigeria
AT abdmajidmuhdzaimi causesofvariationorderinbuildingandcivilengineeringprojectsinnigeria
AT shafaghatarezou causesofvariationorderinbuildingandcivilengineeringprojectsinnigeria
AT maganaaliyumuhammad causesofvariationorderinbuildingandcivilengineeringprojectsinnigeria
AT dankakanafisasabiu causesofvariationorderinbuildingandcivilengineeringprojectsinnigeria