SEM approach: Reclassifying housing delay in Malaysian housing industry

This paper sets out to study, define and reclassify delay in housing delivery system in Malaysia. In the recent years, the issues of delay related to housing and its development are gradually increasing in particular the housing project in Malaysia although the traditional delay factors have been ap...

Full description

Bibliographic Details
Main Authors: Chai, Chang Saar, Md. Yusof, Aminah
Format: Article
Published: JOEBM 2015
Subjects:
_version_ 1796860903556120576
author Chai, Chang Saar
Md. Yusof, Aminah
author_facet Chai, Chang Saar
Md. Yusof, Aminah
author_sort Chai, Chang Saar
collection ePrints
description This paper sets out to study, define and reclassify delay in housing delivery system in Malaysia. In the recent years, the issues of delay related to housing and its development are gradually increasing in particular the housing project in Malaysia although the traditional delay factors have been applied to tackle this problem. Therefore, there is a strong need to reorganized and reclassified the delay factors in order to find an effective resolution and way out to solve the problems. This research was carried out through both primary and secondary sources. Triangulation approach has been utilized, in which quantitative method is used to collect data whereas qualitative method is essential to be used for data validation. Based on the data collected, a Structural Equation Modeling (SEM) model has been form, showing the relationship of structural delay, institutional delay and cultural delay in relation to housing delivery. From the study conducted, it is found that institutional delay is the major contributor to housing delay in Malaysia. Through the data validation of housing delay index, the study concluded that the Malaysian housing industry is currently experiencing moderate delay. The results from this study would help construction practitioners, developer, consultants, contractors, policy makers, and researchers to have a deep understanding on the delays factors caused in construction process so that proper mitigation measures could be taken place.
first_indexed 2024-03-05T19:48:16Z
format Article
id utm.eprints-60410
institution Universiti Teknologi Malaysia - ePrints
last_indexed 2024-03-05T19:48:16Z
publishDate 2015
publisher JOEBM
record_format dspace
spelling utm.eprints-604102021-12-14T04:10:57Z http://eprints.utm.my/60410/ SEM approach: Reclassifying housing delay in Malaysian housing industry Chai, Chang Saar Md. Yusof, Aminah TA Engineering (General). Civil engineering (General) This paper sets out to study, define and reclassify delay in housing delivery system in Malaysia. In the recent years, the issues of delay related to housing and its development are gradually increasing in particular the housing project in Malaysia although the traditional delay factors have been applied to tackle this problem. Therefore, there is a strong need to reorganized and reclassified the delay factors in order to find an effective resolution and way out to solve the problems. This research was carried out through both primary and secondary sources. Triangulation approach has been utilized, in which quantitative method is used to collect data whereas qualitative method is essential to be used for data validation. Based on the data collected, a Structural Equation Modeling (SEM) model has been form, showing the relationship of structural delay, institutional delay and cultural delay in relation to housing delivery. From the study conducted, it is found that institutional delay is the major contributor to housing delay in Malaysia. Through the data validation of housing delay index, the study concluded that the Malaysian housing industry is currently experiencing moderate delay. The results from this study would help construction practitioners, developer, consultants, contractors, policy makers, and researchers to have a deep understanding on the delays factors caused in construction process so that proper mitigation measures could be taken place. JOEBM 2015 Article PeerReviewed Chai, Chang Saar and Md. Yusof, Aminah (2015) SEM approach: Reclassifying housing delay in Malaysian housing industry. Journal Of Economics, Business And Management, 3 (3). pp. 364-369. ISSN 2301-3567 http://dx.doi.org/10.7763/JOEBM.2015.V3.211
spellingShingle TA Engineering (General). Civil engineering (General)
Chai, Chang Saar
Md. Yusof, Aminah
SEM approach: Reclassifying housing delay in Malaysian housing industry
title SEM approach: Reclassifying housing delay in Malaysian housing industry
title_full SEM approach: Reclassifying housing delay in Malaysian housing industry
title_fullStr SEM approach: Reclassifying housing delay in Malaysian housing industry
title_full_unstemmed SEM approach: Reclassifying housing delay in Malaysian housing industry
title_short SEM approach: Reclassifying housing delay in Malaysian housing industry
title_sort sem approach reclassifying housing delay in malaysian housing industry
topic TA Engineering (General). Civil engineering (General)
work_keys_str_mv AT chaichangsaar semapproachreclassifyinghousingdelayinmalaysianhousingindustry
AT mdyusofaminah semapproachreclassifyinghousingdelayinmalaysianhousingindustry