Construction of roller compacted concerete dam: a case study at Batu Hampar dam
Rapid and economical construction are among numerous advantages of the construction of roller compacted concrete (RCC) dam compared to conventional dam. However, the complex process of RCC dam construction is facing difficulties due to lack of understanding and involvement from the local constructio...
Main Authors: | Abdul Hamid, Abdul Rahim, Zulkifli, Assrul Reedza, Arshad, Mohd. Fadzil, Ahmad, Juhaizad |
---|---|
Format: | Conference or Workshop Item |
Published: |
2015
|
Subjects: |
Similar Items
-
Issues and challenges in construction of roller compacted concrete dam in Malaysia
by: Zulkifli, Assrul Reedza
Published: (2013) -
Dam break studies
by: Ismail, Izan Kazura
Published: (2004) -
Seepage flow in homogeneous and zoned earthfill dams
by: Jusoh, Siti Norafida
Published: (2007) -
Transient seepage trend through zoned earthfill dam
by: Gunalan, G. Jaganat
Published: (2008) -
Design and construction of an embankment dam in New South Wales, Australia
by: Zackaria, Nor Hamiza, et al.
Published: (2006)