Pemilihan sistem perparitan sementara untuk diaplikasi di tapak bina

A researched have been conducted to identify method of temporary drainage system that existed at construction site, to identify factors that influenced the selection of temporary drainage to be applied at construction site thus used to develop structured framework system towards the selection of app...

Full description

Bibliographic Details
Main Author: Mahazir, Mashanim
Format: Thesis
Language:English
Published: 2006
Subjects:
Online Access:http://eprints.utm.my/6110/1/MashanimMahazirMFKA2006.pdf
_version_ 1796854021684723712
author Mahazir, Mashanim
author_facet Mahazir, Mashanim
author_sort Mahazir, Mashanim
collection ePrints
description A researched have been conducted to identify method of temporary drainage system that existed at construction site, to identify factors that influenced the selection of temporary drainage to be applied at construction site thus used to develop structured framework system towards the selection of appropriate temporary drainage system to be applied at construction site. Grass lined Channel, Temporary Earthern Diversion Dike, Asphalt Pavement Swales, Geotexile Swales and Earth Swales were the temporary drainage systems that existed in order to minimize or to overcome the problem occurred. Percentage obtained trough qualitative data analysis from participated consultants, contractors and analysis made from case studies of construction site were gained to identify prior factors that influenced the selection of temporary drainage. Through the factors identified, a structured framework system was developed and can be used as guidance to consultants in designing the appropriate temporary drainage system to be applied by the contractor at construction site. Regular maintenance, appropriate design by the consultant, endorsement obtained from the relevant authority, adequate budget allocation in constructing the system, the application of computer aided in selecting the suitable system to be applied, will make the application at the construction site more effective for current use and future.
first_indexed 2024-03-05T18:08:10Z
format Thesis
id utm.eprints-6110
institution Universiti Teknologi Malaysia - ePrints
language English
last_indexed 2024-03-05T18:08:10Z
publishDate 2006
record_format dspace
spelling utm.eprints-61102018-09-17T03:03:13Z http://eprints.utm.my/6110/ Pemilihan sistem perparitan sementara untuk diaplikasi di tapak bina Mahazir, Mashanim TA Engineering (General). Civil engineering (General) A researched have been conducted to identify method of temporary drainage system that existed at construction site, to identify factors that influenced the selection of temporary drainage to be applied at construction site thus used to develop structured framework system towards the selection of appropriate temporary drainage system to be applied at construction site. Grass lined Channel, Temporary Earthern Diversion Dike, Asphalt Pavement Swales, Geotexile Swales and Earth Swales were the temporary drainage systems that existed in order to minimize or to overcome the problem occurred. Percentage obtained trough qualitative data analysis from participated consultants, contractors and analysis made from case studies of construction site were gained to identify prior factors that influenced the selection of temporary drainage. Through the factors identified, a structured framework system was developed and can be used as guidance to consultants in designing the appropriate temporary drainage system to be applied by the contractor at construction site. Regular maintenance, appropriate design by the consultant, endorsement obtained from the relevant authority, adequate budget allocation in constructing the system, the application of computer aided in selecting the suitable system to be applied, will make the application at the construction site more effective for current use and future. 2006-12 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/6110/1/MashanimMahazirMFKA2006.pdf Mahazir, Mashanim (2006) Pemilihan sistem perparitan sementara untuk diaplikasi di tapak bina. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:62013
spellingShingle TA Engineering (General). Civil engineering (General)
Mahazir, Mashanim
Pemilihan sistem perparitan sementara untuk diaplikasi di tapak bina
title Pemilihan sistem perparitan sementara untuk diaplikasi di tapak bina
title_full Pemilihan sistem perparitan sementara untuk diaplikasi di tapak bina
title_fullStr Pemilihan sistem perparitan sementara untuk diaplikasi di tapak bina
title_full_unstemmed Pemilihan sistem perparitan sementara untuk diaplikasi di tapak bina
title_short Pemilihan sistem perparitan sementara untuk diaplikasi di tapak bina
title_sort pemilihan sistem perparitan sementara untuk diaplikasi di tapak bina
topic TA Engineering (General). Civil engineering (General)
url http://eprints.utm.my/6110/1/MashanimMahazirMFKA2006.pdf
work_keys_str_mv AT mahazirmashanim pemilihansistemperparitansementarauntukdiaplikasiditapakbina