Management of Melana watershed using multicriteria decision making approaches

Nowadays, watershed management is very important and need to be given attention especially by government agencies because all resources between it are related. This project proposed using Multicriteria Decision Making Approach (MCDM) to identify and rank which subwatershed in Melana need to given pr...

Full description

Bibliographic Details
Main Author: Yaccob, Ahmad Amzari
Format: Thesis
Language:English
Published: 2007
Subjects:
Online Access:http://eprints.utm.my/6378/1/AhmadAmzariYaccobMFKA2007.pdf
_version_ 1825909885049503744
author Yaccob, Ahmad Amzari
author_facet Yaccob, Ahmad Amzari
author_sort Yaccob, Ahmad Amzari
collection ePrints
description Nowadays, watershed management is very important and need to be given attention especially by government agencies because all resources between it are related. This project proposed using Multicriteria Decision Making Approach (MCDM) to identify and rank which subwatershed in Melana need to given priority by government authorities in planning their strategies or alternatives for improvement Melana catchment. Each subwatershed was ranked using Multicriteria Decision Making Approaches specifically applying Fuzzy Composite Programming (FCP) and Analytic Hierarchy Process (AHP). There were 3 selected subwatershed which were residential, light industry and heavy industry. The objective of this project i) to identify basic indicator for management of Melana watershed, ii) to rank subwatershed in Melana watershed using MCDM approaches, iii) to compare FCP and AHP technique and analyses based on selected basic indicators. The FCP and AHP structures contained 13 first-level indicators, 5 second level indicators, 3 third level indicators and the final indicators. The highest ranking subwatershed was residential with the highest ordered sequence value. The highest ranking subwatershed was also associated with the shortest distance between the fuzzy box and ideal point. The highest ordered sequences value means that subwatershed was the best in economy, water quantity and quality. The critical subwatershed was the lowest ordered sequence value which was heavy industry. In AHP, the highest priority index value was heavy industry. This subwatershed is the critical watershed which need be given attention and conservation. This study showed that FCP has a similar result with AHP.
first_indexed 2024-03-05T18:08:48Z
format Thesis
id utm.eprints-6378
institution Universiti Teknologi Malaysia - ePrints
language English
last_indexed 2024-03-05T18:08:48Z
publishDate 2007
record_format dspace
spelling utm.eprints-63782018-08-29T07:50:59Z http://eprints.utm.my/6378/ Management of Melana watershed using multicriteria decision making approaches Yaccob, Ahmad Amzari HD28 Management. Industrial Management TA Engineering (General). Civil engineering (General) Nowadays, watershed management is very important and need to be given attention especially by government agencies because all resources between it are related. This project proposed using Multicriteria Decision Making Approach (MCDM) to identify and rank which subwatershed in Melana need to given priority by government authorities in planning their strategies or alternatives for improvement Melana catchment. Each subwatershed was ranked using Multicriteria Decision Making Approaches specifically applying Fuzzy Composite Programming (FCP) and Analytic Hierarchy Process (AHP). There were 3 selected subwatershed which were residential, light industry and heavy industry. The objective of this project i) to identify basic indicator for management of Melana watershed, ii) to rank subwatershed in Melana watershed using MCDM approaches, iii) to compare FCP and AHP technique and analyses based on selected basic indicators. The FCP and AHP structures contained 13 first-level indicators, 5 second level indicators, 3 third level indicators and the final indicators. The highest ranking subwatershed was residential with the highest ordered sequence value. The highest ranking subwatershed was also associated with the shortest distance between the fuzzy box and ideal point. The highest ordered sequences value means that subwatershed was the best in economy, water quantity and quality. The critical subwatershed was the lowest ordered sequence value which was heavy industry. In AHP, the highest priority index value was heavy industry. This subwatershed is the critical watershed which need be given attention and conservation. This study showed that FCP has a similar result with AHP. 2007-05 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/6378/1/AhmadAmzariYaccobMFKA2007.pdf Yaccob, Ahmad Amzari (2007) Management of Melana watershed using multicriteria decision making approaches. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:62321
spellingShingle HD28 Management. Industrial Management
TA Engineering (General). Civil engineering (General)
Yaccob, Ahmad Amzari
Management of Melana watershed using multicriteria decision making approaches
title Management of Melana watershed using multicriteria decision making approaches
title_full Management of Melana watershed using multicriteria decision making approaches
title_fullStr Management of Melana watershed using multicriteria decision making approaches
title_full_unstemmed Management of Melana watershed using multicriteria decision making approaches
title_short Management of Melana watershed using multicriteria decision making approaches
title_sort management of melana watershed using multicriteria decision making approaches
topic HD28 Management. Industrial Management
TA Engineering (General). Civil engineering (General)
url http://eprints.utm.my/6378/1/AhmadAmzariYaccobMFKA2007.pdf
work_keys_str_mv AT yaccobahmadamzari managementofmelanawatershedusingmulticriteriadecisionmakingapproaches