Confirmatory strategic information technology implementation for building information modelling adoption model
Information technology (IT) developments in the construction industry require a proportionate response by construction professionals. Building information modelling (BIM) requires strategic changes to the traditional ways construction is carried out. BIM adoption in Malaysia is growing because of re...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit Universiti Sains Malaysia
2016
|
Subjects: | |
Online Access: | http://eprints.utm.my/74350/1/GodwinUcheAliagha2016_ConfirmatoryStrategicInformationTechnologyImplementation.pdf |
_version_ | 1796862195633487872 |
---|---|
author | Enegbuma, W. I. Aliagha, G. U. Ali, K. N. Badiru, Y. Y. |
author_facet | Enegbuma, W. I. Aliagha, G. U. Ali, K. N. Badiru, Y. Y. |
author_sort | Enegbuma, W. I. |
collection | ePrints |
description | Information technology (IT) developments in the construction industry require a proportionate response by construction professionals. Building information modelling (BIM) requires strategic changes to the traditional ways construction is carried out. BIM adoption in Malaysia is growing because of recent efforts to sensitise construction professionals on the need for strategic IT implementation. This paper builds on the theory of business process re-engineering and computer integrated construction for a BIM adoption model. Data were collected from 352 construction professionals (architects, quantity surveyors, engineers and contractors). The data were analysed using Statistical Package for Social Sciences (SPSS) version 18 for descriptive modelling and Analysis of Moment of Structures (AMOS) version 18 for structural equation modelling. Descriptive results showed a high prevalence of the need for BIM competent professionals. Multivariate results revealed a high correlation within the measurement model for business process re-engineering and computer integrated construction. The second-order confirmatory model showed that business process re-engineering and computer integrated construction had a high impact on strategic IT Implementation. Overall, the model validated the conceptual framework of the impact of strategic IT implementation on the adoption rate of BIM in the perception of construction industry professionals in Malaysia. The result denotes the first part of the full adoption model, which can be compared with the adoption rate in other countries. Subsequent research using a diverse sample selection focuses on the mediating effect of collaboration on BIM adoption. |
first_indexed | 2024-03-05T20:07:54Z |
format | Article |
id | utm.eprints-74350 |
institution | Universiti Teknologi Malaysia - ePrints |
language | English |
last_indexed | 2024-03-05T20:07:54Z |
publishDate | 2016 |
publisher | Penerbit Universiti Sains Malaysia |
record_format | dspace |
spelling | utm.eprints-743502017-11-29T23:58:38Z http://eprints.utm.my/74350/ Confirmatory strategic information technology implementation for building information modelling adoption model Enegbuma, W. I. Aliagha, G. U. Ali, K. N. Badiru, Y. Y. HD Industries. Land use. Labor Information technology (IT) developments in the construction industry require a proportionate response by construction professionals. Building information modelling (BIM) requires strategic changes to the traditional ways construction is carried out. BIM adoption in Malaysia is growing because of recent efforts to sensitise construction professionals on the need for strategic IT implementation. This paper builds on the theory of business process re-engineering and computer integrated construction for a BIM adoption model. Data were collected from 352 construction professionals (architects, quantity surveyors, engineers and contractors). The data were analysed using Statistical Package for Social Sciences (SPSS) version 18 for descriptive modelling and Analysis of Moment of Structures (AMOS) version 18 for structural equation modelling. Descriptive results showed a high prevalence of the need for BIM competent professionals. Multivariate results revealed a high correlation within the measurement model for business process re-engineering and computer integrated construction. The second-order confirmatory model showed that business process re-engineering and computer integrated construction had a high impact on strategic IT Implementation. Overall, the model validated the conceptual framework of the impact of strategic IT implementation on the adoption rate of BIM in the perception of construction industry professionals in Malaysia. The result denotes the first part of the full adoption model, which can be compared with the adoption rate in other countries. Subsequent research using a diverse sample selection focuses on the mediating effect of collaboration on BIM adoption. Penerbit Universiti Sains Malaysia 2016 Article PeerReviewed application/pdf en http://eprints.utm.my/74350/1/GodwinUcheAliagha2016_ConfirmatoryStrategicInformationTechnologyImplementation.pdf Enegbuma, W. I. and Aliagha, G. U. and Ali, K. N. and Badiru, Y. Y. (2016) Confirmatory strategic information technology implementation for building information modelling adoption model. Journal of Construction in Developing Countries, 21 (2). pp. 113-129. ISSN 1823-6499 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85020081564&doi=10.21315%2fjcdc2016.21.2.6&partnerID=40&md5=c18f96e41bf33b70bd15b6475972bd39 |
spellingShingle | HD Industries. Land use. Labor Enegbuma, W. I. Aliagha, G. U. Ali, K. N. Badiru, Y. Y. Confirmatory strategic information technology implementation for building information modelling adoption model |
title | Confirmatory strategic information technology implementation for building information modelling adoption model |
title_full | Confirmatory strategic information technology implementation for building information modelling adoption model |
title_fullStr | Confirmatory strategic information technology implementation for building information modelling adoption model |
title_full_unstemmed | Confirmatory strategic information technology implementation for building information modelling adoption model |
title_short | Confirmatory strategic information technology implementation for building information modelling adoption model |
title_sort | confirmatory strategic information technology implementation for building information modelling adoption model |
topic | HD Industries. Land use. Labor |
url | http://eprints.utm.my/74350/1/GodwinUcheAliagha2016_ConfirmatoryStrategicInformationTechnologyImplementation.pdf |
work_keys_str_mv | AT enegbumawi confirmatorystrategicinformationtechnologyimplementationforbuildinginformationmodellingadoptionmodel AT aliaghagu confirmatorystrategicinformationtechnologyimplementationforbuildinginformationmodellingadoptionmodel AT alikn confirmatorystrategicinformationtechnologyimplementationforbuildinginformationmodellingadoptionmodel AT badiruyy confirmatorystrategicinformationtechnologyimplementationforbuildinginformationmodellingadoptionmodel |