Contemporaneous records in construction claim

A claim is a proposition or protestation of the right, without regard to whether rightfully or wrongfully, employed by the party in either a contract or at position of law, for the compensation upon the infringement of the right. However, disputes always arisen from the devoid of the information sub...

Full description

Bibliographic Details
Main Author: Kerk, Chia Cun
Format: Thesis
Language:English
Published: 2017
Subjects:
Online Access:http://eprints.utm.my/77683/1/KerkChiaCunMFAB20171.pdf
_version_ 1796862700921290752
author Kerk, Chia Cun
author_facet Kerk, Chia Cun
author_sort Kerk, Chia Cun
collection ePrints
description A claim is a proposition or protestation of the right, without regard to whether rightfully or wrongfully, employed by the party in either a contract or at position of law, for the compensation upon the infringement of the right. However, disputes always arisen from the devoid of the information submitted in claims or mismanagement of the information. A contemporaneous record might be useful in the claim preparation or substantiation. In local context, the onus of keeping the contemporaneous records is not expressly provided in the standard form of contract, such as PAM 2006 or PWD 2010. In an earlier case, keeping of contemporaneous record had been indicated as a precedent condition in FIDIC Red Book 1987 whereas it had been redefined in release of FIDIC Red Book 1999. A total of eleven previous court cases were analysed in order to identify the various requirements of contemporaneous record or documentation under the construction claim. The two oversea leading court cases were used as supporting cases to the local cases. Claims could be categorized into two, but merely cost claim requires contemporaneous record in court. The courts had emphasized in their decisions on several contemporaneous records which could be summarized as correspondence letter and notification for claim, contract documents (including Bills of Quantities, Letter of Acceptance, Drawings, Specification), endorsed Variation Order, Site Records, Progress Reports, Photographs, Invoices, and List of Defects. The documents referred by the court deemed to be timeously recorded, sufficient information indicating the instruction or direction, and acknowledge received by the parties. It is worth noting that the contemporaneous records in claim shall not merely be originated from the contractors, the records or the substantiation shall rely on the records or knowledge of contractors and consultants, as well as the employer.
first_indexed 2024-03-05T20:15:35Z
format Thesis
id utm.eprints-77683
institution Universiti Teknologi Malaysia - ePrints
language English
last_indexed 2024-03-05T20:15:35Z
publishDate 2017
record_format dspace
spelling utm.eprints-776832018-06-26T08:32:50Z http://eprints.utm.my/77683/ Contemporaneous records in construction claim Kerk, Chia Cun TH Building construction A claim is a proposition or protestation of the right, without regard to whether rightfully or wrongfully, employed by the party in either a contract or at position of law, for the compensation upon the infringement of the right. However, disputes always arisen from the devoid of the information submitted in claims or mismanagement of the information. A contemporaneous record might be useful in the claim preparation or substantiation. In local context, the onus of keeping the contemporaneous records is not expressly provided in the standard form of contract, such as PAM 2006 or PWD 2010. In an earlier case, keeping of contemporaneous record had been indicated as a precedent condition in FIDIC Red Book 1987 whereas it had been redefined in release of FIDIC Red Book 1999. A total of eleven previous court cases were analysed in order to identify the various requirements of contemporaneous record or documentation under the construction claim. The two oversea leading court cases were used as supporting cases to the local cases. Claims could be categorized into two, but merely cost claim requires contemporaneous record in court. The courts had emphasized in their decisions on several contemporaneous records which could be summarized as correspondence letter and notification for claim, contract documents (including Bills of Quantities, Letter of Acceptance, Drawings, Specification), endorsed Variation Order, Site Records, Progress Reports, Photographs, Invoices, and List of Defects. The documents referred by the court deemed to be timeously recorded, sufficient information indicating the instruction or direction, and acknowledge received by the parties. It is worth noting that the contemporaneous records in claim shall not merely be originated from the contractors, the records or the substantiation shall rely on the records or knowledge of contractors and consultants, as well as the employer. 2017-09 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/77683/1/KerkChiaCunMFAB20171.pdf Kerk, Chia Cun (2017) Contemporaneous records in construction claim. Masters thesis, Universiti Teknologi Malaysia, Faculty of Built Environment. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:106615
spellingShingle TH Building construction
Kerk, Chia Cun
Contemporaneous records in construction claim
title Contemporaneous records in construction claim
title_full Contemporaneous records in construction claim
title_fullStr Contemporaneous records in construction claim
title_full_unstemmed Contemporaneous records in construction claim
title_short Contemporaneous records in construction claim
title_sort contemporaneous records in construction claim
topic TH Building construction
url http://eprints.utm.my/77683/1/KerkChiaCunMFAB20171.pdf
work_keys_str_mv AT kerkchiacun contemporaneousrecordsinconstructionclaim