Application of estoppel and waiver in the non-fulfillment of condition precedent

Since the early 1856, the judge has already recognized the importance of the conditions precedent in contract law. In construction contract, conditions precedent is widely used in time-bar provision and usually stipulates the contractor to comply with certain specified procedures if he wants to avai...

Full description

Bibliographic Details
Main Author: Hidzir, Nur 'Izzati
Format: Thesis
Language:English
Published: 2014
Subjects:
Online Access:http://eprints.utm.my/78327/1/NurIzzatiHidzirMFAB20141.pdf
_version_ 1796862830144651264
author Hidzir, Nur 'Izzati
author_facet Hidzir, Nur 'Izzati
author_sort Hidzir, Nur 'Izzati
collection ePrints
description Since the early 1856, the judge has already recognized the importance of the conditions precedent in contract law. In construction contract, conditions precedent is widely used in time-bar provision and usually stipulates the contractor to comply with certain specified procedures if he wants to avail himself of other contractual provisions. It is possible under English law for a condition precedent to be effective, so as to preclude a claimant from bringing an invalid claim. However, in practice, especially in construction contract for instance, the particular circumstances of each situation will need to be considered, not solely because the courts construe these provisions extremely strictly, but also because the actual circumstances of the case might reveal that the conditions precedent has not been effective. Under these circumstances, the contractor may be able to rely upon the equitable principles of waiver and/or estoppel. This principle of estoppel and waiver however can be used only on certain circumstances. Hence the objective of this research is to identify the circumstances or situations that allow the application of estoppel and waiver to be used when the contractor fails to follow conditions precedent. To achieve the objective of this research ten law cases were identified. From the analysis of these cases, there are seven circumstances have been identified: one, when there is non-denying of non-fulfillment of conditions precedent by the employer; two, when there is an acceptance of late submission of conditions precedent in the previous performance; three, when there is a promise made by the employer to the contractor; four, when the conduct or actions made by the employer that gives an impression of accepting of non-fulfillment of conditions precedent; five, when there is failure of the performance of conditions precedent on the employer‟s part that lead to the non-fulfillment of conditions precedent on the contractor‟s part; six, when there is conducts or acts made by the employer that gives agreement to prolong the period of the fulfillment of conditions precedent and lastly, when there is an acceptance of the performance even though the conditions precedent is not been fulfilled. Besides, there are also certain cases that point out that conditions precedent may remain effective.
first_indexed 2024-03-05T20:17:31Z
format Thesis
id utm.eprints-78327
institution Universiti Teknologi Malaysia - ePrints
language English
last_indexed 2024-03-05T20:17:31Z
publishDate 2014
record_format dspace
spelling utm.eprints-783272018-08-26T11:51:50Z http://eprints.utm.my/78327/ Application of estoppel and waiver in the non-fulfillment of condition precedent Hidzir, Nur 'Izzati TH Building construction Since the early 1856, the judge has already recognized the importance of the conditions precedent in contract law. In construction contract, conditions precedent is widely used in time-bar provision and usually stipulates the contractor to comply with certain specified procedures if he wants to avail himself of other contractual provisions. It is possible under English law for a condition precedent to be effective, so as to preclude a claimant from bringing an invalid claim. However, in practice, especially in construction contract for instance, the particular circumstances of each situation will need to be considered, not solely because the courts construe these provisions extremely strictly, but also because the actual circumstances of the case might reveal that the conditions precedent has not been effective. Under these circumstances, the contractor may be able to rely upon the equitable principles of waiver and/or estoppel. This principle of estoppel and waiver however can be used only on certain circumstances. Hence the objective of this research is to identify the circumstances or situations that allow the application of estoppel and waiver to be used when the contractor fails to follow conditions precedent. To achieve the objective of this research ten law cases were identified. From the analysis of these cases, there are seven circumstances have been identified: one, when there is non-denying of non-fulfillment of conditions precedent by the employer; two, when there is an acceptance of late submission of conditions precedent in the previous performance; three, when there is a promise made by the employer to the contractor; four, when the conduct or actions made by the employer that gives an impression of accepting of non-fulfillment of conditions precedent; five, when there is failure of the performance of conditions precedent on the employer‟s part that lead to the non-fulfillment of conditions precedent on the contractor‟s part; six, when there is conducts or acts made by the employer that gives agreement to prolong the period of the fulfillment of conditions precedent and lastly, when there is an acceptance of the performance even though the conditions precedent is not been fulfilled. Besides, there are also certain cases that point out that conditions precedent may remain effective. 2014-01 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/78327/1/NurIzzatiHidzirMFAB20141.pdf Hidzir, Nur 'Izzati (2014) Application of estoppel and waiver in the non-fulfillment of condition precedent. Masters thesis, Universiti Teknologi Malaysia, Faculty of Built Environment. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:80019
spellingShingle TH Building construction
Hidzir, Nur 'Izzati
Application of estoppel and waiver in the non-fulfillment of condition precedent
title Application of estoppel and waiver in the non-fulfillment of condition precedent
title_full Application of estoppel and waiver in the non-fulfillment of condition precedent
title_fullStr Application of estoppel and waiver in the non-fulfillment of condition precedent
title_full_unstemmed Application of estoppel and waiver in the non-fulfillment of condition precedent
title_short Application of estoppel and waiver in the non-fulfillment of condition precedent
title_sort application of estoppel and waiver in the non fulfillment of condition precedent
topic TH Building construction
url http://eprints.utm.my/78327/1/NurIzzatiHidzirMFAB20141.pdf
work_keys_str_mv AT hidzirnurizzati applicationofestoppelandwaiverinthenonfulfillmentofconditionprecedent