Measurement of productivity rate of drainage trench excavation using lean strategy

Productivity in construction industry is the ratio of output over resources that determine the outcome of product. LEAN is the principle used by the manufacturing industry to improve their product. This research apply the measuring productivity principle used by the manufacturing industry on machine...

Full description

Bibliographic Details
Main Author: Shaffruddeen, Muhammad Shahir
Format: Thesis
Language:English
Published: 2018
Subjects:
Online Access:http://eprints.utm.my/78870/1/MuhammadShahirShaffruddeenMFKA2018.pdf
_version_ 1796862936838307840
author Shaffruddeen, Muhammad Shahir
author_facet Shaffruddeen, Muhammad Shahir
author_sort Shaffruddeen, Muhammad Shahir
collection ePrints
description Productivity in construction industry is the ratio of output over resources that determine the outcome of product. LEAN is the principle used by the manufacturing industry to improve their product. This research apply the measuring productivity principle used by the manufacturing industry on machinery to measure the productivity of drainage civil construction activity. Hence, it aims to evaluate the quality of the constructed drainage base on the measured productivity outcomes. In this study, Time Cycle analysis is used to measure the productivity of a backhoe machine used for trench excavation and the labour productivity rate to install the drainage is also measured. Additionally, Cycle Time Tracking & Variance Analysis model are use to analyse the data obtained. The research targets a construction of drainage around Johor Bharu as a case study. The significant of study is to measure the optimum productivity rate of drainage construction. The optimum productivity rate for excavation is 3.59meters per hour with the quality of 4.2 out of 5, while the productivity rate to install the culvert is 8 pieces per hour with the highest quality of 4 out of 5. Productivity measurement can improve the overall construction performance in the construction.
first_indexed 2024-03-05T20:19:08Z
format Thesis
id utm.eprints-78870
institution Universiti Teknologi Malaysia - ePrints
language English
last_indexed 2024-03-05T20:19:08Z
publishDate 2018
record_format dspace
spelling utm.eprints-788702018-09-17T07:15:47Z http://eprints.utm.my/78870/ Measurement of productivity rate of drainage trench excavation using lean strategy Shaffruddeen, Muhammad Shahir TA Engineering (General). Civil engineering (General) Productivity in construction industry is the ratio of output over resources that determine the outcome of product. LEAN is the principle used by the manufacturing industry to improve their product. This research apply the measuring productivity principle used by the manufacturing industry on machinery to measure the productivity of drainage civil construction activity. Hence, it aims to evaluate the quality of the constructed drainage base on the measured productivity outcomes. In this study, Time Cycle analysis is used to measure the productivity of a backhoe machine used for trench excavation and the labour productivity rate to install the drainage is also measured. Additionally, Cycle Time Tracking & Variance Analysis model are use to analyse the data obtained. The research targets a construction of drainage around Johor Bharu as a case study. The significant of study is to measure the optimum productivity rate of drainage construction. The optimum productivity rate for excavation is 3.59meters per hour with the quality of 4.2 out of 5, while the productivity rate to install the culvert is 8 pieces per hour with the highest quality of 4 out of 5. Productivity measurement can improve the overall construction performance in the construction. 2018-01 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/78870/1/MuhammadShahirShaffruddeenMFKA2018.pdf Shaffruddeen, Muhammad Shahir (2018) Measurement of productivity rate of drainage trench excavation using lean strategy. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:108566
spellingShingle TA Engineering (General). Civil engineering (General)
Shaffruddeen, Muhammad Shahir
Measurement of productivity rate of drainage trench excavation using lean strategy
title Measurement of productivity rate of drainage trench excavation using lean strategy
title_full Measurement of productivity rate of drainage trench excavation using lean strategy
title_fullStr Measurement of productivity rate of drainage trench excavation using lean strategy
title_full_unstemmed Measurement of productivity rate of drainage trench excavation using lean strategy
title_short Measurement of productivity rate of drainage trench excavation using lean strategy
title_sort measurement of productivity rate of drainage trench excavation using lean strategy
topic TA Engineering (General). Civil engineering (General)
url http://eprints.utm.my/78870/1/MuhammadShahirShaffruddeenMFKA2018.pdf
work_keys_str_mv AT shaffruddeenmuhammadshahir measurementofproductivityrateofdrainagetrenchexcavationusingleanstrategy