Risk assessment on electrical maintenance activity at Menora Tunnel, Perak
Risk assessment is an essential element for Occupational Safety and Health. Risk assessment allows an organization to assess and control the potential risks to a minimum so as not to impact or causes major accident to workers and organizations. Every maintenance activities in industries such as cons...
Main Authors: | , , , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit Akademia Baru
2018
|
Subjects: | |
Online Access: | http://eprints.utm.my/82040/1/TunMuhammadNorhaizad2018_RiskAssessmentonElectricalMaintenanceActivity.pdf |
_version_ | 1796863505996972032 |
---|---|
author | Azis, Tun Muhammad Norhaizad Bani, Nurul Aini Mad Kaidi, Hazilah Mohd. Aris, Siti Armiza Muhtazaruddin, Mohd. Nabil Abd. Jalil, Siti Zura Mohd. Izhar, Mohd. Azri Usman, Sahnius |
author_facet | Azis, Tun Muhammad Norhaizad Bani, Nurul Aini Mad Kaidi, Hazilah Mohd. Aris, Siti Armiza Muhtazaruddin, Mohd. Nabil Abd. Jalil, Siti Zura Mohd. Izhar, Mohd. Azri Usman, Sahnius |
author_sort | Azis, Tun Muhammad Norhaizad |
collection | ePrints |
description | Risk assessment is an essential element for Occupational Safety and Health. Risk assessment allows an organization to assess and control the potential risks to a minimum so as not to impact or causes major accident to workers and organizations. Every maintenance activities in industries such as construction, manufacturing, agriculture or in other sector should ensure that risk assessment is carried out and all the inherent risks are well controlled. For example, electrical maintenance work in a highway tunnel is also necessary to ensure that the inherent risks are eliminated or controlled to a minimum during the work carried out. This study is to identify potential risks that could occur during electrical maintenance activities in highway tunnels. The objective of the study is to assess the risk faced by the staff during electrical maintenance activity and to recommend the action plans to manage the critical risk which can lead to fatalities during electrical maintenance activity. The risk will be identified and assess based on bowtie analysis method and the measurement of risk level will be referred to five levels of risk-matrix. The development of bowtie diagram will be using a fault tree together with an event tree and barriers to mapping the risk. |
first_indexed | 2024-03-05T20:27:46Z |
format | Article |
id | utm.eprints-82040 |
institution | Universiti Teknologi Malaysia - ePrints |
language | English |
last_indexed | 2024-03-05T20:27:46Z |
publishDate | 2018 |
publisher | Penerbit Akademia Baru |
record_format | dspace |
spelling | utm.eprints-820402019-10-20T04:14:40Z http://eprints.utm.my/82040/ Risk assessment on electrical maintenance activity at Menora Tunnel, Perak Azis, Tun Muhammad Norhaizad Bani, Nurul Aini Mad Kaidi, Hazilah Mohd. Aris, Siti Armiza Muhtazaruddin, Mohd. Nabil Abd. Jalil, Siti Zura Mohd. Izhar, Mohd. Azri Usman, Sahnius T Technology (General) Risk assessment is an essential element for Occupational Safety and Health. Risk assessment allows an organization to assess and control the potential risks to a minimum so as not to impact or causes major accident to workers and organizations. Every maintenance activities in industries such as construction, manufacturing, agriculture or in other sector should ensure that risk assessment is carried out and all the inherent risks are well controlled. For example, electrical maintenance work in a highway tunnel is also necessary to ensure that the inherent risks are eliminated or controlled to a minimum during the work carried out. This study is to identify potential risks that could occur during electrical maintenance activities in highway tunnels. The objective of the study is to assess the risk faced by the staff during electrical maintenance activity and to recommend the action plans to manage the critical risk which can lead to fatalities during electrical maintenance activity. The risk will be identified and assess based on bowtie analysis method and the measurement of risk level will be referred to five levels of risk-matrix. The development of bowtie diagram will be using a fault tree together with an event tree and barriers to mapping the risk. Penerbit Akademia Baru 2018 Article PeerReviewed application/pdf en http://eprints.utm.my/82040/1/TunMuhammadNorhaizad2018_RiskAssessmentonElectricalMaintenanceActivity.pdf Azis, Tun Muhammad Norhaizad and Bani, Nurul Aini and Mad Kaidi, Hazilah and Mohd. Aris, Siti Armiza and Muhtazaruddin, Mohd. Nabil and Abd. Jalil, Siti Zura and Mohd. Izhar, Mohd. Azri and Usman, Sahnius (2018) Risk assessment on electrical maintenance activity at Menora Tunnel, Perak. Journal Of Advanced Research In Occupational Safety And Health, 1 (1). pp. 24-31. ISSN 2637-0255 http://www.akademiabaru.com/doc/AROSHV1_N1_P24_31.pdf |
spellingShingle | T Technology (General) Azis, Tun Muhammad Norhaizad Bani, Nurul Aini Mad Kaidi, Hazilah Mohd. Aris, Siti Armiza Muhtazaruddin, Mohd. Nabil Abd. Jalil, Siti Zura Mohd. Izhar, Mohd. Azri Usman, Sahnius Risk assessment on electrical maintenance activity at Menora Tunnel, Perak |
title | Risk assessment on electrical maintenance activity at Menora Tunnel, Perak |
title_full | Risk assessment on electrical maintenance activity at Menora Tunnel, Perak |
title_fullStr | Risk assessment on electrical maintenance activity at Menora Tunnel, Perak |
title_full_unstemmed | Risk assessment on electrical maintenance activity at Menora Tunnel, Perak |
title_short | Risk assessment on electrical maintenance activity at Menora Tunnel, Perak |
title_sort | risk assessment on electrical maintenance activity at menora tunnel perak |
topic | T Technology (General) |
url | http://eprints.utm.my/82040/1/TunMuhammadNorhaizad2018_RiskAssessmentonElectricalMaintenanceActivity.pdf |
work_keys_str_mv | AT azistunmuhammadnorhaizad riskassessmentonelectricalmaintenanceactivityatmenoratunnelperak AT baninurulaini riskassessmentonelectricalmaintenanceactivityatmenoratunnelperak AT madkaidihazilah riskassessmentonelectricalmaintenanceactivityatmenoratunnelperak AT mohdarissitiarmiza riskassessmentonelectricalmaintenanceactivityatmenoratunnelperak AT muhtazaruddinmohdnabil riskassessmentonelectricalmaintenanceactivityatmenoratunnelperak AT abdjalilsitizura riskassessmentonelectricalmaintenanceactivityatmenoratunnelperak AT mohdizharmohdazri riskassessmentonelectricalmaintenanceactivityatmenoratunnelperak AT usmansahnius riskassessmentonelectricalmaintenanceactivityatmenoratunnelperak |