A preliminary review on transaction cost components within the BIM adopted procurements
The Malaysian construction industry although it plays a crucial function in stimulating the economy, is lagging behind other economic sectors. This is due to its unique characteristics such as fragmentation and slow technology adoption. These very characteristics make the industry susceptible to con...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit UTM Press
2019
|
Subjects: | |
Online Access: | http://eprints.utm.my/85191/1/FaraDivaMustapa2019_APreliminaryReviewonTransactionCost.pdf |
_version_ | 1796863995895873536 |
---|---|
author | Toh, Ka Bean Mustapa, Muzani Mustapa, Fara Diva |
author_facet | Toh, Ka Bean Mustapa, Muzani Mustapa, Fara Diva |
author_sort | Toh, Ka Bean |
collection | ePrints |
description | The Malaysian construction industry although it plays a crucial function in stimulating the economy, is lagging behind other economic sectors. This is due to its unique characteristics such as fragmentation and slow technology adoption. These very characteristics make the industry susceptible to construction disputes. Construction disputes were found to incur high transaction costs (TCs), affect the parties involved, and subsequently increase overall project costs. Because TCs measure the costs that incur from transaction activities, they can be used to better understand the benefits within each transaction. Additionally, TCs are the best mechanism for analysing the ‘unseen’ costs of construction procurement. Previous studies on the traditional, design-and-build, and public private partnership (PPP) procurement methods have demonstrated TCs affect the organizational dynamics of construction and selection of procurement. The emerging Building Information Modeling (BIM) technology is said to be beneficial in addressing the problems associated with disputes and overall project costs. Consequently, many projects embark on BIM adoption in procurement. Hence, this preliminary study seeks to identify the TCs of BIM-adopted procurement by employing a structured literature review to determine the components and activities within the BIM procurement within the BIM implementation. The initial framework for the components of TCs of BIM procurement was drafted by referring to RIBA Plan of Work with BIM overlay. The components are categorised into pre-contract and post-contract components. These components can serve as the basis for developing a framework that can serve as a guideline for construction players involved in managing the TCs of BIM procurement. |
first_indexed | 2024-03-05T20:35:11Z |
format | Article |
id | utm.eprints-85191 |
institution | Universiti Teknologi Malaysia - ePrints |
language | English |
last_indexed | 2024-03-05T20:35:11Z |
publishDate | 2019 |
publisher | Penerbit UTM Press |
record_format | dspace |
spelling | utm.eprints-851912020-03-17T08:17:05Z http://eprints.utm.my/85191/ A preliminary review on transaction cost components within the BIM adopted procurements Toh, Ka Bean Mustapa, Muzani Mustapa, Fara Diva TH434-437 Quantity surveying The Malaysian construction industry although it plays a crucial function in stimulating the economy, is lagging behind other economic sectors. This is due to its unique characteristics such as fragmentation and slow technology adoption. These very characteristics make the industry susceptible to construction disputes. Construction disputes were found to incur high transaction costs (TCs), affect the parties involved, and subsequently increase overall project costs. Because TCs measure the costs that incur from transaction activities, they can be used to better understand the benefits within each transaction. Additionally, TCs are the best mechanism for analysing the ‘unseen’ costs of construction procurement. Previous studies on the traditional, design-and-build, and public private partnership (PPP) procurement methods have demonstrated TCs affect the organizational dynamics of construction and selection of procurement. The emerging Building Information Modeling (BIM) technology is said to be beneficial in addressing the problems associated with disputes and overall project costs. Consequently, many projects embark on BIM adoption in procurement. Hence, this preliminary study seeks to identify the TCs of BIM-adopted procurement by employing a structured literature review to determine the components and activities within the BIM procurement within the BIM implementation. The initial framework for the components of TCs of BIM procurement was drafted by referring to RIBA Plan of Work with BIM overlay. The components are categorised into pre-contract and post-contract components. These components can serve as the basis for developing a framework that can serve as a guideline for construction players involved in managing the TCs of BIM procurement. Penerbit UTM Press 2019 Article PeerReviewed application/pdf en http://eprints.utm.my/85191/1/FaraDivaMustapa2019_APreliminaryReviewonTransactionCost.pdf Toh, Ka Bean and Mustapa, Muzani and Mustapa, Fara Diva (2019) A preliminary review on transaction cost components within the BIM adopted procurements. International Journal of Built Environment and Sustainability, 6 (1-2). pp. 161-167. ISSN 2289-8948 https://dx.doi.org/10.11113/ijbes.v6.n1-2.394 DOI:10.11113/ijbes.v6.n1-2.394 |
spellingShingle | TH434-437 Quantity surveying Toh, Ka Bean Mustapa, Muzani Mustapa, Fara Diva A preliminary review on transaction cost components within the BIM adopted procurements |
title | A preliminary review on transaction cost components within the BIM adopted procurements |
title_full | A preliminary review on transaction cost components within the BIM adopted procurements |
title_fullStr | A preliminary review on transaction cost components within the BIM adopted procurements |
title_full_unstemmed | A preliminary review on transaction cost components within the BIM adopted procurements |
title_short | A preliminary review on transaction cost components within the BIM adopted procurements |
title_sort | preliminary review on transaction cost components within the bim adopted procurements |
topic | TH434-437 Quantity surveying |
url | http://eprints.utm.my/85191/1/FaraDivaMustapa2019_APreliminaryReviewonTransactionCost.pdf |
work_keys_str_mv | AT tohkabean apreliminaryreviewontransactioncostcomponentswithinthebimadoptedprocurements AT mustapamuzani apreliminaryreviewontransactioncostcomponentswithinthebimadoptedprocurements AT mustapafaradiva apreliminaryreviewontransactioncostcomponentswithinthebimadoptedprocurements AT tohkabean preliminaryreviewontransactioncostcomponentswithinthebimadoptedprocurements AT mustapamuzani preliminaryreviewontransactioncostcomponentswithinthebimadoptedprocurements AT mustapafaradiva preliminaryreviewontransactioncostcomponentswithinthebimadoptedprocurements |