Challenges or constraints in the implementation of industrialised building system for projects under Jabatan Kerja Raya Negeri Perak

For many years, the issues of delay in Jabatan Kerja Raya (JKR) projects especially those projects that involve the implementation of IBS as a method of construction have been phenomenal. Its impacts were so significant that it tends give bad impression on the JKR performance and reputation as gover...

Full description

Bibliographic Details
Main Author: Shafie, Muhammad Shazni
Format: Thesis
Language:English
Published: 2020
Subjects:
Online Access:http://eprints.utm.my/86056/1/MuhammadShazniShafieMSKA2020.pdf
_version_ 1796864166751895552
author Shafie, Muhammad Shazni
author_facet Shafie, Muhammad Shazni
author_sort Shafie, Muhammad Shazni
collection ePrints
description For many years, the issues of delay in Jabatan Kerja Raya (JKR) projects especially those projects that involve the implementation of IBS as a method of construction have been phenomenal. Its impacts were so significant that it tends give bad impression on the JKR performance and reputation as government technical agency. Construction delays due to the implementation of IBS can be minimized once their challenges or constraints are identified. The methodologies used in this study were by using literature review and distribution of questionnaires survey. Data have been collected from the relevant parties which directly involved in those projects under JKR Negeri Perak that are using IBS as a method of construction. The results that being obtained from this study was the generation of the list for the most important challenges or constraints in the implementation of IBS that being faced by the relevant parties such as the need of skilled craftsmen in a factory, non existance of special managers to manage IBS projects, shortages of storage space at site, high cost to employ skilled workers, weak communication between projects’ operator and others. The study also has identified the list of suggested method in order to overcome those challenges or constraints through various scope of management. It is hope that the findings from this study will be able to provide important guidelines for JKR to be well prepared at the early stage of the construction and thus will minimize the possibility of IBS construction being delayed in the future.
first_indexed 2024-03-05T20:37:48Z
format Thesis
id utm.eprints-86056
institution Universiti Teknologi Malaysia - ePrints
language English
last_indexed 2024-03-05T20:37:48Z
publishDate 2020
record_format dspace
spelling utm.eprints-860562020-08-30T08:53:11Z http://eprints.utm.my/86056/ Challenges or constraints in the implementation of industrialised building system for projects under Jabatan Kerja Raya Negeri Perak Shafie, Muhammad Shazni TA Engineering (General). Civil engineering (General) For many years, the issues of delay in Jabatan Kerja Raya (JKR) projects especially those projects that involve the implementation of IBS as a method of construction have been phenomenal. Its impacts were so significant that it tends give bad impression on the JKR performance and reputation as government technical agency. Construction delays due to the implementation of IBS can be minimized once their challenges or constraints are identified. The methodologies used in this study were by using literature review and distribution of questionnaires survey. Data have been collected from the relevant parties which directly involved in those projects under JKR Negeri Perak that are using IBS as a method of construction. The results that being obtained from this study was the generation of the list for the most important challenges or constraints in the implementation of IBS that being faced by the relevant parties such as the need of skilled craftsmen in a factory, non existance of special managers to manage IBS projects, shortages of storage space at site, high cost to employ skilled workers, weak communication between projects’ operator and others. The study also has identified the list of suggested method in order to overcome those challenges or constraints through various scope of management. It is hope that the findings from this study will be able to provide important guidelines for JKR to be well prepared at the early stage of the construction and thus will minimize the possibility of IBS construction being delayed in the future. 2020 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/86056/1/MuhammadShazniShafieMSKA2020.pdf Shafie, Muhammad Shazni (2020) Challenges or constraints in the implementation of industrialised building system for projects under Jabatan Kerja Raya Negeri Perak. Masters thesis, Universiti Teknologi Malaysia, Faculty of Engineering - School of Civil Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:134205
spellingShingle TA Engineering (General). Civil engineering (General)
Shafie, Muhammad Shazni
Challenges or constraints in the implementation of industrialised building system for projects under Jabatan Kerja Raya Negeri Perak
title Challenges or constraints in the implementation of industrialised building system for projects under Jabatan Kerja Raya Negeri Perak
title_full Challenges or constraints in the implementation of industrialised building system for projects under Jabatan Kerja Raya Negeri Perak
title_fullStr Challenges or constraints in the implementation of industrialised building system for projects under Jabatan Kerja Raya Negeri Perak
title_full_unstemmed Challenges or constraints in the implementation of industrialised building system for projects under Jabatan Kerja Raya Negeri Perak
title_short Challenges or constraints in the implementation of industrialised building system for projects under Jabatan Kerja Raya Negeri Perak
title_sort challenges or constraints in the implementation of industrialised building system for projects under jabatan kerja raya negeri perak
topic TA Engineering (General). Civil engineering (General)
url http://eprints.utm.my/86056/1/MuhammadShazniShafieMSKA2020.pdf
work_keys_str_mv AT shafiemuhammadshazni challengesorconstraintsintheimplementationofindustrialisedbuildingsystemforprojectsunderjabatankerjarayanegeriperak