Highway interchange simulation
This paper presents a real case study endeavor to apply highway interchange simulation distribution of vehicle movement by using modeling to review, assess, and improve the current traffic practices in Malaysia. First, building the implementation process diagram for a traffic modeling simulation and...
Main Author: | Mohamed Balrwin, Rafeg Ali |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2008
|
Subjects: | |
Online Access: | http://eprints.utm.my/9669/1/RafegAliMFKA2008.pdf |
Similar Items
-
Construction readiness parameters for highway projects
by: A. R., Radzi, et al.
Published: (2019) -
Factors affecting the success of highway construction projects: The case of Malaysia
by: A. R., Rahimi, et al.
Published: (2020) -
Factors affecting the success of highway construction projects : the case of Malaysia
by: R. A., Rahman, et al.
Published: (2019) -
Highway accelerated loading instrument (HALI) for concrete block pavement
by: Ling, Tung Chai, et al.
Published: (2006) -
Extent of highway capacity loss resulting from road humps
by: Ben-Edigbe, Johnnie, et al.
Published: (2012)