Omissions of main contractors original scopes
“Omissions” is a term that can be described as removal part of the scope of work from original scope of work. Normally, cost of removal scope of work is deducted from the original contract value. In the event to agree on the omissions; The Contractor may argue that omissions of the original scope co...
Main Author: | Jaafar, Affendy |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2021
|
Subjects: | |
Online Access: | http://eprints.utm.my/96899/1/AffendyJaafarMFABU2021.pdf.pdf |
Similar Items
-
A review on critical success facteffect of tourism on demand of hotel room type and its tariff
by: Abd. Razak, Noor Amni, et al.
Published: (2015) -
Assessment overviews on quality proportion of the high rise residential building
by: Noori, Noorsidi Aizuddin Mat, et al.
Published: (2015) -
Factor affecting the housing financing of bumiputera in Iskandar Malaysia
by: Ismail, Azizah, et al.
Published: (2015) -
Critical success factors for facilities management implementation in the healthcare industry
by: Ahmad Pakrudin, Nur Azrin, et al.
Published: (2017) -
A review on the effectiveness of safety training methods for Malaysia construction industry
by: Goh, Alfred Pui Teck, et al.
Published: (2015)