Determination of critical environmental, social, infrastructure, and economic indicators as evaluation checklist for pre-project abandonment plan assessment in-line with sustainable development goal plan

The increasing number of project abandonment because of the Novel Coronavirus pandemic 2019 (Covid-19) calls for better management of abandonment projects. The outbreak of Covid-19 has affected the environment, economy, and society aspects globally. In a developed country like Malaysia, the requirem...

Full description

Bibliographic Details
Main Authors: Abdullah, S. N., Aznah, A., Mohd. Hakim, Mohd. Hakim, Md. Din, M. F., Ponraj, M., Mat Taib, S.
Format: Conference or Workshop Item
Language:English
Published: 2022
Subjects:
Online Access:http://eprints.utm.my/98490/1/MohdFadhil2022_DeterminationofCriticalEnvironmentalSocialInfrastructure.pdf
_version_ 1796866630708363264
author Abdullah, S. N.
Aznah, A.
Mohd. Hakim, Mohd. Hakim
Md. Din, M. F.
Ponraj, M.
Mat Taib, S.
author_facet Abdullah, S. N.
Aznah, A.
Mohd. Hakim, Mohd. Hakim
Md. Din, M. F.
Ponraj, M.
Mat Taib, S.
author_sort Abdullah, S. N.
collection ePrints
description The increasing number of project abandonment because of the Novel Coronavirus pandemic 2019 (Covid-19) calls for better management of abandonment projects. The outbreak of Covid-19 has affected the environment, economy, and society aspects globally. In a developed country like Malaysia, the requirement to submit an abandonment plan is stipulated under the Environmental Guidelines in Malaysia (EGIM) 2016. Therefore, this study aimed to develop a Sustainable Pre-Project Abandonment Plan Assessment Checklist in Malaysia that is in line with the Sustainable Development Goal (SDG) 2030 aspirations. This new Sustainable Pre-Project Abandonment Plan Assessment Checklist in Malaysia is comprehensively structured; is expected to minimise the negative impact of the abandonment process towards the environment, socio-economy, and efficient management of infrastructure; and complies with the related legislation in Malaysia. In this study, data was collected and analysed using NVivo12. It consisted of findings from documents reviewed such as legislations, journals, and books. From the NVivo12 analysis, the results showed 28 critical indicators for abandonment plan assessment and related legislation that synchronises with SDG 2030 is required to develop the Proposed Sustainable Pre-Project Abandonment Plan Assessment Checklist in Malaysia.
first_indexed 2024-03-05T21:15:03Z
format Conference or Workshop Item
id utm.eprints-98490
institution Universiti Teknologi Malaysia - ePrints
language English
last_indexed 2024-03-05T21:15:03Z
publishDate 2022
record_format dspace
spelling utm.eprints-984902023-01-11T03:38:40Z http://eprints.utm.my/98490/ Determination of critical environmental, social, infrastructure, and economic indicators as evaluation checklist for pre-project abandonment plan assessment in-line with sustainable development goal plan Abdullah, S. N. Aznah, A. Mohd. Hakim, Mohd. Hakim Md. Din, M. F. Ponraj, M. Mat Taib, S. TA Engineering (General). Civil engineering (General) The increasing number of project abandonment because of the Novel Coronavirus pandemic 2019 (Covid-19) calls for better management of abandonment projects. The outbreak of Covid-19 has affected the environment, economy, and society aspects globally. In a developed country like Malaysia, the requirement to submit an abandonment plan is stipulated under the Environmental Guidelines in Malaysia (EGIM) 2016. Therefore, this study aimed to develop a Sustainable Pre-Project Abandonment Plan Assessment Checklist in Malaysia that is in line with the Sustainable Development Goal (SDG) 2030 aspirations. This new Sustainable Pre-Project Abandonment Plan Assessment Checklist in Malaysia is comprehensively structured; is expected to minimise the negative impact of the abandonment process towards the environment, socio-economy, and efficient management of infrastructure; and complies with the related legislation in Malaysia. In this study, data was collected and analysed using NVivo12. It consisted of findings from documents reviewed such as legislations, journals, and books. From the NVivo12 analysis, the results showed 28 critical indicators for abandonment plan assessment and related legislation that synchronises with SDG 2030 is required to develop the Proposed Sustainable Pre-Project Abandonment Plan Assessment Checklist in Malaysia. 2022 Conference or Workshop Item PeerReviewed application/pdf en http://eprints.utm.my/98490/1/MohdFadhil2022_DeterminationofCriticalEnvironmentalSocialInfrastructure.pdf Abdullah, S. N. and Aznah, A. and Mohd. Hakim, Mohd. Hakim and Md. Din, M. F. and Ponraj, M. and Mat Taib, S. (2022) Determination of critical environmental, social, infrastructure, and economic indicators as evaluation checklist for pre-project abandonment plan assessment in-line with sustainable development goal plan. In: 9th AUN/SEED-Net Regional Conference on Natural Disaster, RCND 2021, 15 - 16 December 2021, Virtual, Online. http://dx.doi.org/10.1088/1755-1315/1091/1/012044
spellingShingle TA Engineering (General). Civil engineering (General)
Abdullah, S. N.
Aznah, A.
Mohd. Hakim, Mohd. Hakim
Md. Din, M. F.
Ponraj, M.
Mat Taib, S.
Determination of critical environmental, social, infrastructure, and economic indicators as evaluation checklist for pre-project abandonment plan assessment in-line with sustainable development goal plan
title Determination of critical environmental, social, infrastructure, and economic indicators as evaluation checklist for pre-project abandonment plan assessment in-line with sustainable development goal plan
title_full Determination of critical environmental, social, infrastructure, and economic indicators as evaluation checklist for pre-project abandonment plan assessment in-line with sustainable development goal plan
title_fullStr Determination of critical environmental, social, infrastructure, and economic indicators as evaluation checklist for pre-project abandonment plan assessment in-line with sustainable development goal plan
title_full_unstemmed Determination of critical environmental, social, infrastructure, and economic indicators as evaluation checklist for pre-project abandonment plan assessment in-line with sustainable development goal plan
title_short Determination of critical environmental, social, infrastructure, and economic indicators as evaluation checklist for pre-project abandonment plan assessment in-line with sustainable development goal plan
title_sort determination of critical environmental social infrastructure and economic indicators as evaluation checklist for pre project abandonment plan assessment in line with sustainable development goal plan
topic TA Engineering (General). Civil engineering (General)
url http://eprints.utm.my/98490/1/MohdFadhil2022_DeterminationofCriticalEnvironmentalSocialInfrastructure.pdf
work_keys_str_mv AT abdullahsn determinationofcriticalenvironmentalsocialinfrastructureandeconomicindicatorsasevaluationchecklistforpreprojectabandonmentplanassessmentinlinewithsustainabledevelopmentgoalplan
AT aznaha determinationofcriticalenvironmentalsocialinfrastructureandeconomicindicatorsasevaluationchecklistforpreprojectabandonmentplanassessmentinlinewithsustainabledevelopmentgoalplan
AT mohdhakimmohdhakim determinationofcriticalenvironmentalsocialinfrastructureandeconomicindicatorsasevaluationchecklistforpreprojectabandonmentplanassessmentinlinewithsustainabledevelopmentgoalplan
AT mddinmf determinationofcriticalenvironmentalsocialinfrastructureandeconomicindicatorsasevaluationchecklistforpreprojectabandonmentplanassessmentinlinewithsustainabledevelopmentgoalplan
AT ponrajm determinationofcriticalenvironmentalsocialinfrastructureandeconomicindicatorsasevaluationchecklistforpreprojectabandonmentplanassessmentinlinewithsustainabledevelopmentgoalplan
AT mattaibs determinationofcriticalenvironmentalsocialinfrastructureandeconomicindicatorsasevaluationchecklistforpreprojectabandonmentplanassessmentinlinewithsustainabledevelopmentgoalplan