Validating site selection criteria for precast manufacturing plant in Malaysia
The Malaysian Government has endorsed the usage of Industrialised Building System (IBS) in domestic projects none of the studies have contributed to the location decision for precast manufacturing plant which required proper location to improve the local economic activity development.The study in th...
Main Authors: | Azman, Mohamed Nor Azhari, Mohd Nawi, Mohd Nasrun, S. Ahamad, Mohd Sanusi, Kiong, Tee Tze |
---|---|
Format: | Article |
Language: | English |
Published: |
AENSI
2014
|
Subjects: | |
Online Access: | https://repo.uum.edu.my/id/eprint/10989/1/Fulpaper%20Nasrun%20AJBAS%202014_462-468.pdf |
Similar Items
-
The selection of IBS precast manufacturing plant in Malaysia using GIS
by: Azman, Mohamed Nor Azhari, et al.
Published: (2012) -
IBS survey 2010: Drivers, barriers and critical success factors in adopting industrialised building system (IBS) construction by G7 contractors in Malaysia
by: Mohamad Kamar, Kamarul Anuar, et al.
Published: (2014) -
Criteria requirement for IBS vendor selection
by: Nursal, Ahmad Taufik, et al.
Published: (2016) -
Key success factors for team integration practice in Malaysian industrialised building system (IBS) construction industry
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2016) -
The impact of client and manufacturers role and industrial relationships on construction innovation
by: Abdul Nifa, Faizatul Akmar, et al.
Published: (2006)