A preliminary survey of the application of Industrialised Building System (IBS)in Kedah and Perlis Malaysian construction industry

Statistic shows that between 1995 to 2020,Malaysia will need a total of 8,850,554 houses, including 4,964,560 units of new housing to cater for an increase in population during this period. In the 7th Malaysia Plan, the country intended to construct about 800,000 units of houses for its population.I...

Full description

Bibliographic Details
Main Authors: Mohd Nawi, Mohd Nasrun, Abdul Nifa, Faizatul Akmar, Abdullah, Shardy, Mat Yasin, Fadhil
Format: Conference or Workshop Item
Language:English
Published: 2007
Subjects:
Online Access:https://repo.uum.edu.my/id/eprint/14263/1/CIB11399%20%281%29.pdf
_version_ 1803626754760245248
author Mohd Nawi, Mohd Nasrun
Abdul Nifa, Faizatul Akmar
Abdullah, Shardy
Mat Yasin, Fadhil
author_facet Mohd Nawi, Mohd Nasrun
Abdul Nifa, Faizatul Akmar
Abdullah, Shardy
Mat Yasin, Fadhil
author_sort Mohd Nawi, Mohd Nasrun
collection UUM
description Statistic shows that between 1995 to 2020,Malaysia will need a total of 8,850,554 houses, including 4,964,560 units of new housing to cater for an increase in population during this period. In the 7th Malaysia Plan, the country intended to construct about 800,000 units of houses for its population.Indeed, 585,000 units or 73.1% were planned for the low and low medium cost houses. Industrialisation is a process of social and economic change whereby a human society is transformed from a preindustrial to an industrial state. It is a part of wider modernisation process through the technology system and one of the solutions for this increasing housing demand. One such technology is the industrialised building system (IBS).In Malaysia, since 1998, the Construction Industry Development Board (CIDB) has been actively promoting the use of IBS in the local construction industry by deploying large funds for research, developing standards as well as implementing various training and promotional programs. Although the IBS system improves the quality of projects, easier to control, reducing rectification work and lowering the total cost of construction, the trend of IBS usage in Malaysian construction projects are still below the national target.This paper highlights the application of the IBS among developers in Kedah and Perlis areas, the types of system used, and the barriers behind the low usage of IBS among developer companies in those areas.Solutions for encouraging the use of IBS for the construction industry have also been identified.
first_indexed 2024-07-04T05:55:12Z
format Conference or Workshop Item
id uum-14263
institution Universiti Utara Malaysia
language English
last_indexed 2024-07-04T05:55:12Z
publishDate 2007
record_format dspace
spelling uum-142632015-05-19T09:35:36Z https://repo.uum.edu.my/id/eprint/14263/ A preliminary survey of the application of Industrialised Building System (IBS)in Kedah and Perlis Malaysian construction industry Mohd Nawi, Mohd Nasrun Abdul Nifa, Faizatul Akmar Abdullah, Shardy Mat Yasin, Fadhil TH Building construction Statistic shows that between 1995 to 2020,Malaysia will need a total of 8,850,554 houses, including 4,964,560 units of new housing to cater for an increase in population during this period. In the 7th Malaysia Plan, the country intended to construct about 800,000 units of houses for its population.Indeed, 585,000 units or 73.1% were planned for the low and low medium cost houses. Industrialisation is a process of social and economic change whereby a human society is transformed from a preindustrial to an industrial state. It is a part of wider modernisation process through the technology system and one of the solutions for this increasing housing demand. One such technology is the industrialised building system (IBS).In Malaysia, since 1998, the Construction Industry Development Board (CIDB) has been actively promoting the use of IBS in the local construction industry by deploying large funds for research, developing standards as well as implementing various training and promotional programs. Although the IBS system improves the quality of projects, easier to control, reducing rectification work and lowering the total cost of construction, the trend of IBS usage in Malaysian construction projects are still below the national target.This paper highlights the application of the IBS among developers in Kedah and Perlis areas, the types of system used, and the barriers behind the low usage of IBS among developer companies in those areas.Solutions for encouraging the use of IBS for the construction industry have also been identified. 2007-11-05 Conference or Workshop Item PeerReviewed application/pdf en https://repo.uum.edu.my/id/eprint/14263/1/CIB11399%20%281%29.pdf Mohd Nawi, Mohd Nasrun and Abdul Nifa, Faizatul Akmar and Abdullah, Shardy and Mat Yasin, Fadhil (2007) A preliminary survey of the application of Industrialised Building System (IBS)in Kedah and Perlis Malaysian construction industry. In: Conference on Sustainable Building South-East Asia (SB07SEA), 5-7 November 2007, Institute Sultan Iskandar of Urban Habitat and Highrise, Level 4, Dewan Sultan Iskandar, UTM. http://www.irbnet.de/daten/iconda/CIB11356.pdf
spellingShingle TH Building construction
Mohd Nawi, Mohd Nasrun
Abdul Nifa, Faizatul Akmar
Abdullah, Shardy
Mat Yasin, Fadhil
A preliminary survey of the application of Industrialised Building System (IBS)in Kedah and Perlis Malaysian construction industry
title A preliminary survey of the application of Industrialised Building System (IBS)in Kedah and Perlis Malaysian construction industry
title_full A preliminary survey of the application of Industrialised Building System (IBS)in Kedah and Perlis Malaysian construction industry
title_fullStr A preliminary survey of the application of Industrialised Building System (IBS)in Kedah and Perlis Malaysian construction industry
title_full_unstemmed A preliminary survey of the application of Industrialised Building System (IBS)in Kedah and Perlis Malaysian construction industry
title_short A preliminary survey of the application of Industrialised Building System (IBS)in Kedah and Perlis Malaysian construction industry
title_sort preliminary survey of the application of industrialised building system ibs in kedah and perlis malaysian construction industry
topic TH Building construction
url https://repo.uum.edu.my/id/eprint/14263/1/CIB11399%20%281%29.pdf
work_keys_str_mv AT mohdnawimohdnasrun apreliminarysurveyoftheapplicationofindustrialisedbuildingsystemibsinkedahandperlismalaysianconstructionindustry
AT abdulnifafaizatulakmar apreliminarysurveyoftheapplicationofindustrialisedbuildingsystemibsinkedahandperlismalaysianconstructionindustry
AT abdullahshardy apreliminarysurveyoftheapplicationofindustrialisedbuildingsystemibsinkedahandperlismalaysianconstructionindustry
AT matyasinfadhil apreliminarysurveyoftheapplicationofindustrialisedbuildingsystemibsinkedahandperlismalaysianconstructionindustry
AT mohdnawimohdnasrun preliminarysurveyoftheapplicationofindustrialisedbuildingsystemibsinkedahandperlismalaysianconstructionindustry
AT abdulnifafaizatulakmar preliminarysurveyoftheapplicationofindustrialisedbuildingsystemibsinkedahandperlismalaysianconstructionindustry
AT abdullahshardy preliminarysurveyoftheapplicationofindustrialisedbuildingsystemibsinkedahandperlismalaysianconstructionindustry
AT matyasinfadhil preliminarysurveyoftheapplicationofindustrialisedbuildingsystemibsinkedahandperlismalaysianconstructionindustry