"B" Gas Plant Vessels Replacement look back at PT. XYZ
Purpose – The look back evaluates the project performance of “B” Gas Plant Vessels Replacement that successful to be installed on site with plus and minus following result: • Operational Excellence / HES Compliance: no Motor Vehicle Crash (MVC), no Total Recordable Incidents (TRI), no Spill, and ze...
Main Author: | |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | https://repo.uum.edu.my/id/eprint/15959/1/P36.pdf |
_version_ | 1803627063430610944 |
---|---|
author | Zaluchu, Anna Lucky Meridiana |
author_facet | Zaluchu, Anna Lucky Meridiana |
author_sort | Zaluchu, Anna Lucky Meridiana |
collection | UUM |
description | Purpose – The look back evaluates the project performance of “B” Gas Plant Vessels Replacement
that successful to be installed on site with plus and minus following result: • Operational Excellence / HES Compliance: no Motor Vehicle Crash (MVC), no Total Recordable Incidents (TRI), no Spill, and zero accident related to H2S emission.• Reliability: zero downtime due to corrosion at compression system.• Budget compliance: the total spending is still within budget, about 63% of the total original
budget.• Schedule: delay in construction execution.Design/Methodology/Approach – Major deviations of the project performance are investigated by using Root Cause Analysis (RCA).
Findings – Based on the RCA, it’s found the critical items need to be improved for the future project.Research limitations / implications – This paper is intended as learning for college students, some data are not included in this paper due to company confidential. Original/Value – To present an original approach of look back that modelled after incident investigation system. |
first_indexed | 2024-07-04T06:00:06Z |
format | Conference or Workshop Item |
id | uum-15959 |
institution | Universiti Utara Malaysia |
language | English |
last_indexed | 2024-07-04T06:00:06Z |
publishDate | 2014 |
record_format | dspace |
spelling | uum-159592016-04-18T08:40:27Z https://repo.uum.edu.my/id/eprint/15959/ "B" Gas Plant Vessels Replacement look back at PT. XYZ Zaluchu, Anna Lucky Meridiana HD28 Management. Industrial Management Purpose – The look back evaluates the project performance of “B” Gas Plant Vessels Replacement that successful to be installed on site with plus and minus following result: • Operational Excellence / HES Compliance: no Motor Vehicle Crash (MVC), no Total Recordable Incidents (TRI), no Spill, and zero accident related to H2S emission.• Reliability: zero downtime due to corrosion at compression system.• Budget compliance: the total spending is still within budget, about 63% of the total original budget.• Schedule: delay in construction execution.Design/Methodology/Approach – Major deviations of the project performance are investigated by using Root Cause Analysis (RCA). Findings – Based on the RCA, it’s found the critical items need to be improved for the future project.Research limitations / implications – This paper is intended as learning for college students, some data are not included in this paper due to company confidential. Original/Value – To present an original approach of look back that modelled after incident investigation system. 2014-08-18 Conference or Workshop Item PeerReviewed application/pdf en https://repo.uum.edu.my/id/eprint/15959/1/P36.pdf Zaluchu, Anna Lucky Meridiana (2014) "B" Gas Plant Vessels Replacement look back at PT. XYZ. In: 4th International Conference on Technology and Operations Management (ICTOM04), 18-19 August 2014, Kuala Lumpur, Malaysia. http://stmlportal.net/ictom04/TOC.html |
spellingShingle | HD28 Management. Industrial Management Zaluchu, Anna Lucky Meridiana "B" Gas Plant Vessels Replacement look back at PT. XYZ |
title | "B" Gas Plant Vessels Replacement look back at PT. XYZ |
title_full | "B" Gas Plant Vessels Replacement look back at PT. XYZ |
title_fullStr | "B" Gas Plant Vessels Replacement look back at PT. XYZ |
title_full_unstemmed | "B" Gas Plant Vessels Replacement look back at PT. XYZ |
title_short | "B" Gas Plant Vessels Replacement look back at PT. XYZ |
title_sort | b gas plant vessels replacement look back at pt xyz |
topic | HD28 Management. Industrial Management |
url | https://repo.uum.edu.my/id/eprint/15959/1/P36.pdf |
work_keys_str_mv | AT zaluchuannaluckymeridiana bgasplantvesselsreplacementlookbackatptxyz |