A proposed model in improve project cost and schedule predictability
PT. ABC Indonesia is facing a problem in executing the capital project.The cost and predictability of projects were found low as indicated by delay and overrun.According to the assessment conducted to projects that were executed in 2008-2012, the problem contributed to the low cost and schedule pre...
Main Author: | Kurniawan, Yuli |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | https://repo.uum.edu.my/id/eprint/15991/1/P46.pdf |
Similar Items
-
Hospital scheduling analysis: a contemporary review and proposed schematic understanding
by: Ali, Hussein Hasan, et al.
Published: (2018) -
Minimizing cost-overruns in construction projects
by: Daud, Siti Aminah, et al.
Published: (2015) -
Integrating Lean and Cost of Quality Models to Improve Hospitals’ Financials: A Conceptual Framework
by: Aoun, Malak, et al.
Published: (2017) -
Case on Integrated Time and Cost Monitoring of Construction Projects
by: M., Waris, et al.
Published: (2017) -
Towards an effective business model for golf industry: A proposed framework
by: Mohd Zahari, Fadhilah, et al.
Published: (2017)