A proposed model in improve project cost and schedule predictability
PT. ABC Indonesia is facing a problem in executing the capital project.The cost and predictability of projects were found low as indicated by delay and overrun.According to the assessment conducted to projects that were executed in 2008-2012, the problem contributed to the low cost and schedule pre...
Hoofdauteur: | Kurniawan, Yuli |
---|---|
Formaat: | Conference or Workshop Item |
Taal: | English |
Gepubliceerd in: |
2014
|
Onderwerpen: | |
Online toegang: | https://repo.uum.edu.my/id/eprint/15991/1/P46.pdf |
Gelijkaardige items
-
Hospital scheduling analysis: a contemporary review and proposed schematic understanding
door: Ali, Hussein Hasan, et al.
Gepubliceerd in: (2018) -
Minimizing cost-overruns in construction projects
door: Daud, Siti Aminah, et al.
Gepubliceerd in: (2015) -
Integrating Lean and Cost of Quality Models to Improve Hospitals’ Financials: A Conceptual Framework
door: Aoun, Malak, et al.
Gepubliceerd in: (2017) -
Case on Integrated Time and Cost Monitoring of Construction Projects
door: M., Waris, et al.
Gepubliceerd in: (2017) -
Towards an effective business model for golf industry: A proposed framework
door: Mohd Zahari, Fadhilah, et al.
Gepubliceerd in: (2017)