Readiness assessment for implementation of Integrated Project Delivery (IPD) in Industrialized Building System (IBS)
The Malaysian government has taken the initiative of implementing Industrialized Building System (IBS) in which components are manufactured in mass production under a controlled environment (on or off site), transported, positioned and assembled into a structure with minimal additional site works.It...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit UTM Press
2015
|
Subjects: | |
Online Access: | https://repo.uum.edu.my/id/eprint/16144/1/55.pdf |
_version_ | 1825803655354253312 |
---|---|
author | Osman, Wan Nadzri Mohd Nawi, Mohd Nasrun Anuar, Herman Shah Radzuan, Kamaruddin Osman, N. N. |
author_facet | Osman, Wan Nadzri Mohd Nawi, Mohd Nasrun Anuar, Herman Shah Radzuan, Kamaruddin Osman, N. N. |
author_sort | Osman, Wan Nadzri |
collection | UUM |
description | The Malaysian government has taken the initiative of implementing Industrialized Building System (IBS) in which components are manufactured in mass production under a controlled environment (on or off site), transported, positioned and assembled into a structure with minimal additional site works.It is hope that IBS can improve the performance of construction industry.However, the main barriers in IBS implementation is project delivery process.In order to overcome this barrier, ‘Integrated Project Delivery (IPD)’ as a project delivery system using a multi-party contract (more than two parties selected) was introduced.Integrated Project Delivery (IPD) is defined as a project delivery approach that integrates people, systems, business structures and practices into a process that collaboratively
harnesses the talents and insights of all project participants to optimize the results, increase value to the owner, reduce waste, and maximize efficiency through all phases of design, fabrication and construction.Although, many researchers have argue the importance of IPD in project delivery process, but the readiness of
construction industries must be established. This research will use a quantitative study.This quantitative research process will involve a few phases including literature review stage, data collection stage, framework development stage,
validation and recommendation stage.As the aim of this research is to obtain data based on multidisciplinary IBS stakeholders’ perspectives, respondent include project managers, resident engineers, and architects, contractors etc. are among the potential candidates. At the end of the process, this research will develops the readiness assessment model to implement IPD in IBS construction projects. |
first_indexed | 2024-07-04T06:00:38Z |
format | Article |
id | uum-16144 |
institution | Universiti Utara Malaysia |
language | English |
last_indexed | 2024-07-04T06:00:38Z |
publishDate | 2015 |
publisher | Penerbit UTM Press |
record_format | eprints |
spelling | uum-161442016-04-17T01:36:04Z https://repo.uum.edu.my/id/eprint/16144/ Readiness assessment for implementation of Integrated Project Delivery (IPD) in Industrialized Building System (IBS) Osman, Wan Nadzri Mohd Nawi, Mohd Nasrun Anuar, Herman Shah Radzuan, Kamaruddin Osman, N. N. TH Building construction The Malaysian government has taken the initiative of implementing Industrialized Building System (IBS) in which components are manufactured in mass production under a controlled environment (on or off site), transported, positioned and assembled into a structure with minimal additional site works.It is hope that IBS can improve the performance of construction industry.However, the main barriers in IBS implementation is project delivery process.In order to overcome this barrier, ‘Integrated Project Delivery (IPD)’ as a project delivery system using a multi-party contract (more than two parties selected) was introduced.Integrated Project Delivery (IPD) is defined as a project delivery approach that integrates people, systems, business structures and practices into a process that collaboratively harnesses the talents and insights of all project participants to optimize the results, increase value to the owner, reduce waste, and maximize efficiency through all phases of design, fabrication and construction.Although, many researchers have argue the importance of IPD in project delivery process, but the readiness of construction industries must be established. This research will use a quantitative study.This quantitative research process will involve a few phases including literature review stage, data collection stage, framework development stage, validation and recommendation stage.As the aim of this research is to obtain data based on multidisciplinary IBS stakeholders’ perspectives, respondent include project managers, resident engineers, and architects, contractors etc. are among the potential candidates. At the end of the process, this research will develops the readiness assessment model to implement IPD in IBS construction projects. Penerbit UTM Press 2015 Article PeerReviewed application/pdf en https://repo.uum.edu.my/id/eprint/16144/1/55.pdf Osman, Wan Nadzri and Mohd Nawi, Mohd Nasrun and Anuar, Herman Shah and Radzuan, Kamaruddin and Osman, N. N. (2015) Readiness assessment for implementation of Integrated Project Delivery (IPD) in Industrialized Building System (IBS). Jurnal Teknologi, 77 (4). pp. 91-95. ISSN 0127-9696 http://www.jurnalteknologi.utm.my/index.php/jurnalteknologi/article/view/6046 |
spellingShingle | TH Building construction Osman, Wan Nadzri Mohd Nawi, Mohd Nasrun Anuar, Herman Shah Radzuan, Kamaruddin Osman, N. N. Readiness assessment for implementation of Integrated Project Delivery (IPD) in Industrialized Building System (IBS) |
title | Readiness assessment for implementation of Integrated Project Delivery (IPD) in Industrialized Building System (IBS) |
title_full | Readiness assessment for implementation of Integrated Project Delivery (IPD) in Industrialized Building System (IBS) |
title_fullStr | Readiness assessment for implementation of Integrated Project Delivery (IPD) in Industrialized Building System (IBS) |
title_full_unstemmed | Readiness assessment for implementation of Integrated Project Delivery (IPD) in Industrialized Building System (IBS) |
title_short | Readiness assessment for implementation of Integrated Project Delivery (IPD) in Industrialized Building System (IBS) |
title_sort | readiness assessment for implementation of integrated project delivery ipd in industrialized building system ibs |
topic | TH Building construction |
url | https://repo.uum.edu.my/id/eprint/16144/1/55.pdf |
work_keys_str_mv | AT osmanwannadzri readinessassessmentforimplementationofintegratedprojectdeliveryipdinindustrializedbuildingsystemibs AT mohdnawimohdnasrun readinessassessmentforimplementationofintegratedprojectdeliveryipdinindustrializedbuildingsystemibs AT anuarhermanshah readinessassessmentforimplementationofintegratedprojectdeliveryipdinindustrializedbuildingsystemibs AT radzuankamaruddin readinessassessmentforimplementationofintegratedprojectdeliveryipdinindustrializedbuildingsystemibs AT osmannn readinessassessmentforimplementationofintegratedprojectdeliveryipdinindustrializedbuildingsystemibs |