Readiness assessment for implementation of Integrated Project Delivery (IPD) in Industrialized Building System (IBS)

The Malaysian government has taken the initiative of implementing Industrialized Building System (IBS) in which components are manufactured in mass production under a controlled environment (on or off site), transported, positioned and assembled into a structure with minimal additional site works.It...

Full description

Bibliographic Details
Main Authors: Osman, Wan Nadzri, Mohd Nawi, Mohd Nasrun, Anuar, Herman Shah, Radzuan, Kamaruddin, Osman, N. N.
Format: Article
Language:English
Published: Penerbit UTM Press 2015
Subjects:
Online Access:https://repo.uum.edu.my/id/eprint/16144/1/55.pdf
_version_ 1825803655354253312
author Osman, Wan Nadzri
Mohd Nawi, Mohd Nasrun
Anuar, Herman Shah
Radzuan, Kamaruddin
Osman, N. N.
author_facet Osman, Wan Nadzri
Mohd Nawi, Mohd Nasrun
Anuar, Herman Shah
Radzuan, Kamaruddin
Osman, N. N.
author_sort Osman, Wan Nadzri
collection UUM
description The Malaysian government has taken the initiative of implementing Industrialized Building System (IBS) in which components are manufactured in mass production under a controlled environment (on or off site), transported, positioned and assembled into a structure with minimal additional site works.It is hope that IBS can improve the performance of construction industry.However, the main barriers in IBS implementation is project delivery process.In order to overcome this barrier, ‘Integrated Project Delivery (IPD)’ as a project delivery system using a multi-party contract (more than two parties selected) was introduced.Integrated Project Delivery (IPD) is defined as a project delivery approach that integrates people, systems, business structures and practices into a process that collaboratively harnesses the talents and insights of all project participants to optimize the results, increase value to the owner, reduce waste, and maximize efficiency through all phases of design, fabrication and construction.Although, many researchers have argue the importance of IPD in project delivery process, but the readiness of construction industries must be established. This research will use a quantitative study.This quantitative research process will involve a few phases including literature review stage, data collection stage, framework development stage, validation and recommendation stage.As the aim of this research is to obtain data based on multidisciplinary IBS stakeholders’ perspectives, respondent include project managers, resident engineers, and architects, contractors etc. are among the potential candidates. At the end of the process, this research will develops the readiness assessment model to implement IPD in IBS construction projects.
first_indexed 2024-07-04T06:00:38Z
format Article
id uum-16144
institution Universiti Utara Malaysia
language English
last_indexed 2024-07-04T06:00:38Z
publishDate 2015
publisher Penerbit UTM Press
record_format eprints
spelling uum-161442016-04-17T01:36:04Z https://repo.uum.edu.my/id/eprint/16144/ Readiness assessment for implementation of Integrated Project Delivery (IPD) in Industrialized Building System (IBS) Osman, Wan Nadzri Mohd Nawi, Mohd Nasrun Anuar, Herman Shah Radzuan, Kamaruddin Osman, N. N. TH Building construction The Malaysian government has taken the initiative of implementing Industrialized Building System (IBS) in which components are manufactured in mass production under a controlled environment (on or off site), transported, positioned and assembled into a structure with minimal additional site works.It is hope that IBS can improve the performance of construction industry.However, the main barriers in IBS implementation is project delivery process.In order to overcome this barrier, ‘Integrated Project Delivery (IPD)’ as a project delivery system using a multi-party contract (more than two parties selected) was introduced.Integrated Project Delivery (IPD) is defined as a project delivery approach that integrates people, systems, business structures and practices into a process that collaboratively harnesses the talents and insights of all project participants to optimize the results, increase value to the owner, reduce waste, and maximize efficiency through all phases of design, fabrication and construction.Although, many researchers have argue the importance of IPD in project delivery process, but the readiness of construction industries must be established. This research will use a quantitative study.This quantitative research process will involve a few phases including literature review stage, data collection stage, framework development stage, validation and recommendation stage.As the aim of this research is to obtain data based on multidisciplinary IBS stakeholders’ perspectives, respondent include project managers, resident engineers, and architects, contractors etc. are among the potential candidates. At the end of the process, this research will develops the readiness assessment model to implement IPD in IBS construction projects. Penerbit UTM Press 2015 Article PeerReviewed application/pdf en https://repo.uum.edu.my/id/eprint/16144/1/55.pdf Osman, Wan Nadzri and Mohd Nawi, Mohd Nasrun and Anuar, Herman Shah and Radzuan, Kamaruddin and Osman, N. N. (2015) Readiness assessment for implementation of Integrated Project Delivery (IPD) in Industrialized Building System (IBS). Jurnal Teknologi, 77 (4). pp. 91-95. ISSN 0127-9696 http://www.jurnalteknologi.utm.my/index.php/jurnalteknologi/article/view/6046
spellingShingle TH Building construction
Osman, Wan Nadzri
Mohd Nawi, Mohd Nasrun
Anuar, Herman Shah
Radzuan, Kamaruddin
Osman, N. N.
Readiness assessment for implementation of Integrated Project Delivery (IPD) in Industrialized Building System (IBS)
title Readiness assessment for implementation of Integrated Project Delivery (IPD) in Industrialized Building System (IBS)
title_full Readiness assessment for implementation of Integrated Project Delivery (IPD) in Industrialized Building System (IBS)
title_fullStr Readiness assessment for implementation of Integrated Project Delivery (IPD) in Industrialized Building System (IBS)
title_full_unstemmed Readiness assessment for implementation of Integrated Project Delivery (IPD) in Industrialized Building System (IBS)
title_short Readiness assessment for implementation of Integrated Project Delivery (IPD) in Industrialized Building System (IBS)
title_sort readiness assessment for implementation of integrated project delivery ipd in industrialized building system ibs
topic TH Building construction
url https://repo.uum.edu.my/id/eprint/16144/1/55.pdf
work_keys_str_mv AT osmanwannadzri readinessassessmentforimplementationofintegratedprojectdeliveryipdinindustrializedbuildingsystemibs
AT mohdnawimohdnasrun readinessassessmentforimplementationofintegratedprojectdeliveryipdinindustrializedbuildingsystemibs
AT anuarhermanshah readinessassessmentforimplementationofintegratedprojectdeliveryipdinindustrializedbuildingsystemibs
AT radzuankamaruddin readinessassessmentforimplementationofintegratedprojectdeliveryipdinindustrializedbuildingsystemibs
AT osmannn readinessassessmentforimplementationofintegratedprojectdeliveryipdinindustrializedbuildingsystemibs