Readiness assessment for implementation of Integrated Project Delivery (IPD) in Industrialized Building System (IBS)
The Malaysian government has taken the initiative of implementing Industrialized Building System (IBS) in which components are manufactured in mass production under a controlled environment (on or off site), transported, positioned and assembled into a structure with minimal additional site works.It...
Main Authors: | Osman, Wan Nadzri, Mohd Nawi, Mohd Nasrun, Anuar, Herman Shah, Radzuan, Kamaruddin, Osman, N. N. |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit UTM Press
2015
|
Subjects: | |
Online Access: | https://repo.uum.edu.my/id/eprint/16144/1/55.pdf |
Similar Items
-
Readiness Assessment for Implementation of Integrated Project Delivery (IPD) in Industrialised Building System (IBS) Projects
by: Osman, Wan Nadzri, et al.
Published: (2015) -
Improving integrated practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2014) -
Key factors for integrated project team delivery: A proposed study in IBS Malaysian construction projects
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2014) -
Key success factors for team integration practice in Malaysian industrialised building system (IBS) construction industry
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2016) -
Malaysian Industrialised Building System (IBS): A review of studies
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2015)