Improving team integration in Malaysian IBS construction projects: A partnering approach
Due to the combination of problems and issues that arose using traditional construction methods, such as fragmentation, time delay, wastages, lack of sustainability etc, the Malaysian Government proposed a new solution through industrialisation technology called Industrialised Building System (IBS)...
Main Authors: | Abdul Nifa, Faizatul Akmar, Mohd Nawi, Mohd Nasrun, Lee, Angela |
---|---|
Format: | Article |
Language: | English |
Published: |
UUM College of Business
2012
|
Subjects: | |
Online Access: | https://repo.uum.edu.my/id/eprint/17843/1/JTOM%207%201%20%201-16.pdf |
Similar Items
-
Critical success factors for improving team integration in Industrialised Building System (IBS) construction projects: The Malaysian case
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2012) -
Key factors for integrated project team delivery: A proposed study in IBS Malaysian construction projects
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2014) -
Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2013) -
Improving construction industry through Integrated Project Delivery (IPD)
by: Abdul Rahim, Syukran, et al.
Published: (2015) -
Integrated project delivery (IPD) in Malaysian construction industry dealing with waste issue
by: Abdul Rahim, Syukran, et al.
Published: (2015)