Technology barriers of industrialized building system (IBS): the Malaysian case

Industrialized Building System (IBS) is an alternative construction method that was introduced to improve the productivity of the Malaysian construction project.The implementation of IBS in the Malaysian construction industries not only could reduce the time of construction process, but it also can...

Full description

Bibliographic Details
Main Authors: Abd Razak, Rohaida, Mohd Nawi, Mohd Nasrun
Format: Conference or Workshop Item
Language:English
Published: Universiti Putra Malaysia Press 2017
Subjects:
Online Access:https://repo.uum.edu.my/id/eprint/22374/1/STML%E2%80%93Go%20Green%202016%2032%2040.pdf
_version_ 1803628353836548096
author Abd Razak, Rohaida
Mohd Nawi, Mohd Nasrun
author_facet Abd Razak, Rohaida
Mohd Nawi, Mohd Nasrun
author_sort Abd Razak, Rohaida
collection UUM
description Industrialized Building System (IBS) is an alternative construction method that was introduced to improve the productivity of the Malaysian construction project.The implementation of IBS in the Malaysian construction industries not only could reduce the time of construction process, but it also can provide better site management, reduce labour intensity, improve the quality and the efficiency of construction. Even though the implementation of IBS had been introduced since 50 years ago, however the level of its uptake is still far away from the ideal objectives of the Government.Therefore, this research had been carried out in order to analyse and explore this issue deeper by identifying the definition of IBS, the categories of IBS and the technology barriers of IBS that occurs in the Malaysian construction industries.For additional information, the scope of this study was focused in both areas of Kedah and Perlis.In order to investigate the problem, this research had been generated to identify the barriers of IBS implementation by using a qualitative research approach which is face – to – face interview technique.The data that had been obtained from the interviews had been analysed using the content analysis technique. As for conclusion, the technology barriers of IBS in Kedah construction projects such as cost issues and design factors had been identified and discussed.
first_indexed 2024-07-04T06:20:37Z
format Conference or Workshop Item
id uum-22374
institution Universiti Utara Malaysia
language English
last_indexed 2024-07-04T06:20:37Z
publishDate 2017
publisher Universiti Putra Malaysia Press
record_format dspace
spelling uum-223742017-07-05T02:58:42Z https://repo.uum.edu.my/id/eprint/22374/ Technology barriers of industrialized building system (IBS): the Malaysian case Abd Razak, Rohaida Mohd Nawi, Mohd Nasrun TH Building construction Industrialized Building System (IBS) is an alternative construction method that was introduced to improve the productivity of the Malaysian construction project.The implementation of IBS in the Malaysian construction industries not only could reduce the time of construction process, but it also can provide better site management, reduce labour intensity, improve the quality and the efficiency of construction. Even though the implementation of IBS had been introduced since 50 years ago, however the level of its uptake is still far away from the ideal objectives of the Government.Therefore, this research had been carried out in order to analyse and explore this issue deeper by identifying the definition of IBS, the categories of IBS and the technology barriers of IBS that occurs in the Malaysian construction industries.For additional information, the scope of this study was focused in both areas of Kedah and Perlis.In order to investigate the problem, this research had been generated to identify the barriers of IBS implementation by using a qualitative research approach which is face – to – face interview technique.The data that had been obtained from the interviews had been analysed using the content analysis technique. As for conclusion, the technology barriers of IBS in Kedah construction projects such as cost issues and design factors had been identified and discussed. Universiti Putra Malaysia Press 2017 Conference or Workshop Item PeerReviewed application/pdf en https://repo.uum.edu.my/id/eprint/22374/1/STML%E2%80%93Go%20Green%202016%2032%2040.pdf Abd Razak, Rohaida and Mohd Nawi, Mohd Nasrun (2017) Technology barriers of industrialized building system (IBS): the Malaysian case. In: Symposium on Technology Management & Logistics (STML–Go Green) 2016, 6th - 7th December 2016, Universiti Utara Malaysia, Sintok, Malaysia. http://stmlportal.net/stmlgogreen2016/pdf/p32.pdf
spellingShingle TH Building construction
Abd Razak, Rohaida
Mohd Nawi, Mohd Nasrun
Technology barriers of industrialized building system (IBS): the Malaysian case
title Technology barriers of industrialized building system (IBS): the Malaysian case
title_full Technology barriers of industrialized building system (IBS): the Malaysian case
title_fullStr Technology barriers of industrialized building system (IBS): the Malaysian case
title_full_unstemmed Technology barriers of industrialized building system (IBS): the Malaysian case
title_short Technology barriers of industrialized building system (IBS): the Malaysian case
title_sort technology barriers of industrialized building system ibs the malaysian case
topic TH Building construction
url https://repo.uum.edu.my/id/eprint/22374/1/STML%E2%80%93Go%20Green%202016%2032%2040.pdf
work_keys_str_mv AT abdrazakrohaida technologybarriersofindustrializedbuildingsystemibsthemalaysiancase
AT mohdnawimohdnasrun technologybarriersofindustrializedbuildingsystemibsthemalaysiancase