Technology barriers of industrialized building system (IBS): the Malaysian case
Industrialized Building System (IBS) is an alternative construction method that was introduced to improve the productivity of the Malaysian construction project.The implementation of IBS in the Malaysian construction industries not only could reduce the time of construction process, but it also can...
المؤلفون الرئيسيون: | Abd Razak, Rohaida, Mohd Nawi, Mohd Nasrun |
---|---|
التنسيق: | Conference or Workshop Item |
اللغة: | English |
منشور في: |
Universiti Putra Malaysia Press
2017
|
الموضوعات: | |
الوصول للمادة أونلاين: | https://repo.uum.edu.my/id/eprint/22374/1/STML%E2%80%93Go%20Green%202016%2032%2040.pdf |
مواد مشابهة
-
Technology acceptance: Malaysian industrialised building system (IBS) case
حسب: Mohd Nawi, Mohd Nasrun, وآخرون
منشور في: (2015) -
Embracing industrialised building system (IBS) across the Malaysian construction industry
حسب: Mohd Nawi, Mohd Nasrun, وآخرون
منشور في: (2013) -
A review of delay factors in Malaysian Industrialized Building System (IBS) construction project
حسب: Mohd Nasir, Najuwa, وآخرون
منشور في: (2016) -
Suitability of IBS formwork system in Malaysian construction industry
حسب: Mohd Nawi, Mohd Nasrun, وآخرون
منشور في: (2015) -
A preliminary survey of the application of Industrialised Building System (IBS)in Kedah and Perlis Malaysian construction industry
حسب: Mohd Nawi, Mohd Nasrun, وآخرون
منشور في: (2007)