Investigating factors of delay in IBS construction project: manufacturer perspectives
Government of Malaysia has enthusiastically supported the implementation of Industrialized Building System (IBS) that was early introduced in 1960’s. IBS is seen capable to ease the problem of delay that has been long haunting Malaysian construction industry. However, the issue of delay still exists...
Main Authors: | Mohd Nawi, Mohd Nasrun, Mohd Nasir, Najuwa, Azman, Mohamed Nor Azhari, Jumintono, Jumintono, Khairudin, Moh |
---|---|
Format: | Article |
Language: | English |
Published: |
School of Engineering, Taylor’s University College
2019
|
Subjects: | |
Online Access: | https://repo.uum.edu.my/id/eprint/26099/1/JESTEC%202019%2059%2066.pdf |
Similar Items
-
A review of delay factors in Malaysian Industrialized Building System (IBS) construction project
by: Mohd Nasir, Najuwa, et al.
Published: (2016) -
Improving communication in managing industrialised building system (IBS) projects:Virtual environment
by: Ahmad Pozin, Mohd Affendi, et al.
Published: (2017) -
A Cause of Communication Failure in Managing Industrialized Building System (IBS) Projects: A Perspective View from Project Managers
by: Ahmad Pozin, Mohd Affendi, et al.
Published: (2018) -
An ecological study on enhancing the Malaysian
construction ecosystem: readiness implementation
factors in Industrialized Building System (IBS) projects
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2019) -
Supply Chain Management (SCM): Disintegration Team Factors in Malaysian Industrialised Building System (IBS) Construction Projects
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2018)