A Review of Traditional Project Procurement Towards Integrated Practice
As a new integrated procurement approach, Integrated Project Delivery (IPD) has been introduced as an alternative towards improving sustainability and integrated construction performance. Currently, however, most of the project procurement or method in Malaysia are still based on the traditional c...
Main Authors: | Mohd Nawi, Mohd Nasrun, Abdul Nifa, Faizatul Akmar, Ahmed, Vian |
---|---|
Format: | Article |
Language: | English |
Published: |
AENSI
2014
|
Subjects: | |
Online Access: | https://repo.uum.edu.my/id/eprint/31620/1/AEJSA%2008%2002%2065-70%202014.pdf |
Similar Items
-
A Review of Traditional Project Procurement Towards Integrated Practice
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2014) -
Integrated Project Delivery (Ipd): A Collaborative Approach to Improve
the Construction Industry
by: Abdul Rahim, Syukran, et al.
Published: (2016) -
Integrated Project Delivery (IPD): A Collaborative Approach to Improve
the Construction Industry
by: Abdul Rahim, Syukran, et al.
Published: (2016) -
A Strategy towards Team Integration Practice for Improving the Design and Construction Process in the Malaysian Industrialized Building System Projects
by: Othman, Mohd Zainudin, et al.
Published: (2016) -
A Strategy Towards Team Integration Practice for Improving the Design and Construction Process in the Malaysian Industrialized Building System Projects
by: Othman, Mohd Zainudin, et al.
Published: (2016)