Readiness in Knowledge and Ability for Implementation of Industrialised Building System (IBS) In Malaysian Construction Industry
This study explores the key factors of readiness in implementation of Industrialised Building System (IBS) in Malaysian Construction Industry. Previous studies pointed out that readiness issues are one of the barriers in implementation of IBS. Readiness is a preparation for something, or willing and...
Main Authors: | Tamrin, Norhidayah, Mohd Nawi, Mohd Nasrun, Abdul Nifa, Faizatul Akmar |
---|---|
Format: | Article |
Language: | English |
Published: |
2016
|
Subjects: | |
Online Access: | https://repo.uum.edu.my/id/eprint/31633/1/IIBS%2039%2009%2047-53%202016.pdf |
Similar Items
-
Readiness Assessment for Implementation of Integrated Project Delivery (IPD) in Industrialised Building System (IBS) Projects
by: Osman, Wan Nadzri, et al.
Published: (2015) -
A Strategy towards Team Integration Practice for Improving the Design and Construction Process in the Malaysian Industrialized Building System Projects
by: Othman, Mohd Zainudin, et al.
Published: (2016) -
A Strategy Towards Team Integration Practice for Improving the Design and Construction Process in the Malaysian Industrialized Building System Projects
by: Othman, Mohd Zainudin, et al.
Published: (2016) -
Integrated Project Delivery (Ipd): A Collaborative Approach to Improve
the Construction Industry
by: Abdul Rahim, Syukran, et al.
Published: (2016) -
Integrated Project Delivery (IPD): A Collaborative Approach to Improve
the Construction Industry
by: Abdul Rahim, Syukran, et al.
Published: (2016)