Readiness Assessment for Implementation of Integrated Project Delivery (IPD) in Industrialised Building System (IBS) Projects
The Malaysian government has taken the initiative of implementing Industrialised Building System (IBS) in which components are manufactured in mass production under a controlled environment (on or off site), transported, positioned and assembled into a structure with minimal additional site works. I...
Main Authors: | Osman, Wan Nadzri, Mohd Nawi, Mohd Nasrun, Anuar, Herman Shah, Radzuan, Kamaruddin |
---|---|
Format: | Article |
Language: | English |
Published: |
Science Publishing Corporation Inc
2015
|
Subjects: | |
Online Access: | https://repo.uum.edu.my/id/eprint/31814/1/IJET%2077%2004%202015%2094-95.pdf |
Similar Items
-
Readiness in Knowledge and Ability for Implementation of
Industrialised Building System (IBS) In Malaysian Construction Industry
by: Tamrin, Norhidayah, et al.
Published: (2016) -
Integrated Project Delivery (Ipd): A Collaborative Approach to Improve
the Construction Industry
by: Abdul Rahim, Syukran, et al.
Published: (2016) -
Integrated Project Delivery (IPD): A Collaborative Approach to Improve
the Construction Industry
by: Abdul Rahim, Syukran, et al.
Published: (2016) -
Kajian Perspektif di Kalangan Pemaju Perumahan Tentang System Binaan Banggunan Berindustri (IBS) di Negeri Kedah dan Perlis
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2008) -
A Preliminary Framework for Preventing Disputes in Different Stages of Building Construction Projects
by: Muhammuddin, Nur Nadhirah, et al.
Published: (2023)