Showing 1 - 11 results of 11 for search '"Analytic Hierarchy Process"', query time: 0.07s Refine Results
  1. 1

    Selection of contractor by using Analytical Hierarchy Process (AHP) by Putri Zulaiha, Razi, Noram Irwan, Ramli, Mohamad Idris, Ali, Putra Jaya, Ramadhansyah

    Published 2019
    “…This paper aiming in make use of the analytical hierarchy process (AHP) as a decision support model to select contractor. …”
    Get full text
    Conference or Workshop Item
  2. 2

    Selection of contractor by Using Analytical Hierarchy Process (AHP) by Putri Zulaiha, Razi, Noram Irwan, Ramli, Putra Jaya, Ramadhansyah, Mohamad Idris, Ali

    Published 2020
    “…This paper aiming in make use of the analytical hierarchy process (AHP) as a decision support model to select contractor. …”
    Get full text
    Conference or Workshop Item
  3. 3

    Selection of Best Consultant by using Analytical Hierarchy Process (AHP) by Putri Zulaiha, Razi, Noram Irwan, Ramli, Mohamad Idris, Ali, Putra Jaya, Ramadhansyah

    Published 2020
    “…In this study, an AHP-based consultant selection model is applied to develop and assist in decision making process to resolve the consultant selection problem in choosing the most favourable consultant's criteria combination. The Analytic Hierarchy Process (AHP) is an established decision method used to synthesize judgements and select the best alternative. …”
    Get full text
    Conference or Workshop Item
  4. 4

    Selection of Method in Construction Industry by using Analytical Hierarchy Process (AHP) by Putri Zulaiha, Razi, Noram Irwan, Ramli, Mohamad Idris, Ali, Putra Jaya, Ramadhansyah

    Published 2020
    “…This paper aiming in identifying the criteria and suitability for selecting different kind of construction delivery method in construction by using the multi-criteria decision making (MCDM) namely the Analytical Hierarchy Process (AHP) method. Results provides some empirical finding which contractor for Grade 7 is suitable employing the industrial building system(IBS) method while the traditional method is appropriately for the Grade 1 contractor.…”
    Get full text
    Conference or Workshop Item
  5. 5

    Overview of analytical hierarchy process decision making method for construction risk management by Putri Zulaiha, Razi, Mohamad Idris, Ali, Noram Irwan, Ramli

    Published 2019
    “…In ensuring smoothness of the construction project, a multi-criteria decision making (MCDM) technique as a systematic tool has been used widely, namely Analytical Hierarchy Process (AHP). Based on the 40 journal articles, questions of which civil engineering field does AHP mostly employed as decision making tools in any of risk occurrence may be answered. …”
    Get full text
    Conference or Workshop Item
  6. 6

    AHP-based analysis of the risk assessment delay case study of public road construction project: An empirical study by Putri Zulaiha, Razi, Mohamad Idris, Ali, Noram Irwan, Ramli

    Published 2019
    “…The designate pair-wise questionnaire survey was distributed to the road project team in accordance with the Analytic Hierarchy Process (AHP) technique. The delay risk was assessed quantitatively by prioritizing the risk delay factors and conducting sensitivity analysis in determining the critical construction phase. …”
    Get full text
    Article
  7. 7

    Exploring risk associated to public road infrastructure construction projects by Razi, P. Z., Mohamad Idris, Ali, Noram Irwan, Ramli

    Published 2021
    “…The delay risk assessed quantitatively employing the Analytic Hierarchy Process (AHP) technique by prioritising the risk delay factors. …”
    Get full text
    Conference or Workshop Item
  8. 8

    Assessing earthquake-induced housing damage: A fuzzy Ahp approach incorporating local parameters and Pga Zoning in the Bantul District, Indonesia by Bawono, A. S., Noram Irwan, Ramli, Mohamad Idris, Ali

    Published 2024
    “…The methodology presented in this paper introduced a framework called Fuzzy Analytic Hierarchy Process (FAHP). This framework aimed to assist decision-makers, engineers, and policymakers in choosing the most appropriate category for assessing earthquake-induced housing damage. …”
    Get full text
    Conference or Workshop Item
  9. 9

    Incorporation of risk index for risk response and risk mitigation strategies of public-private partnership (PPP) housing construction project in Malaysia by P. Z., Razi, Mohamad Idris, Ali, Noram Irwan, Ramli

    Published 2019
    “…A total of thirty-three (33) respondent involved in the PPP housing construction assessing the risk elements employing the Analytical Hierarchy Process (AHP). Findings reveal that among the risks that were captured for high to extreme risks (0.100 < RI ≤ 0.150) are geologic hazard risk (0.125), and inflation and interest rate risk (0.116) whereas strategy proposed for both of the extreme risks are avoiding the risk and it best to be assigned the risks to the private sector. …”
    Get full text
    Conference or Workshop Item
  10. 10

    Incorporation of Risk Index for Risk Response and Risk Mitigation Strategies of Public-Private Partnership (PPP) Housing Construction Project in Malaysia by Putri Zulaiha, Razi, Mohamad Idris, Ali, Noram Irwan, Ramli

    Published 2020
    “…A total of thirty-three (33) respondent involved in the PPP housing construction assessing the risk elements employing the Analytical Hierarchy Process (AHP). Findings reveal that among the risks that were captured for high to extreme risks (0.100 < RI ≤ 0.150) are geologic hazard risk (0.125), and inflation and interest rate risk (0.116) whereas strategy proposed for both of the extreme risks are avoiding the risk and it best to be assigned the risks to the private sector. …”
    Get full text
    Conference or Workshop Item
  11. 11

    Prioritizing solutions to mitigate abandoned housing projects: Insights from AHP analysis in Malaysia by Nur Farhayu, Ariffin, Saidah An’nisaa, Salam, Mohamad Idris, Ali, Noram Irwan, Ramli, Omar, Jamaludin

    Published 2024
    “…The analytical framework for the study involves the use of the Analytical Hierarchy Process (AHP). This method facilitates the establishment of a pairwise relationship between factors and solutions related to abandoned housing projects in Malaysia. …”
    Get full text
    Article