-
1
Experimental study on piles as settlement reducers in model piled rafts
Published 2012“…Although raft foundation may meet the requirement of bearing capacity easily, it tends to settle excessively and exceed the serviceability requirement. As such, piled raft foundation was first introduced by Burland et al. (1977) mainly to reduce the settlement to within allowable range, based on the introduction of composite foundation made up of a raft and some piles by Davis and Poulos (1972). …”
Get full text
Final Year Project (FYP) -
2
Experimental study on piles as settlement reducers in modeled piled raft
Published 2012“…This study examines the effect of piled raft and raft resting on pile reinforced sand. …”
Get full text
Final Year Project (FYP) -
3
Finite element analysis of piled raft : load transfer through piles and raft
Published 2011Get full text
Final Year Project (FYP) -
4
Piles as settlement reducers in raft
Published 2010“…For a given pile number, stiffer piles would cause the largest reduction in settlement. …”
Get full text
Thesis -
5
A comparison of Eurocodes and BS codes in the design of vertically loaded pile (b) : pile founded in clay
Published 2013“…Pile design using British standards (BS8004:1986) will soon be replaced by Eurocode 7 (EC7). …”
Get full text
Final Year Project (FYP) -
6
Finite element analysis of piled raft
Published 2011“…Piled Raft foundations are often seen as a more economical and superior foundation system compared to single foundation since it takes into account contributions of both the pile and raft. …”
Get full text
Final Year Project (FYP) -
7
Pile design using eurocode 7
Published 2014“…Parametric studies were conducted to investigate the pile resistance for specific pile geometries and pile lengths required for a specific loading using both ‘Model Pile’ procedure and ‘Alternative’ procedure. …”
Get full text
Final Year Project (FYP) -
8
Load settlement characteristics of piled rafts in sand
Published 2011“…This study investigates the effects of pile numbers, pile length, pile spacing and pile diameters on the load-settlement response of a piled raft in dense sand through model tests. …”
Get full text
Final Year Project (FYP) -
9
Load settlement characteristics of a piled raft in sand
Published 2010“…A model test tank and a loading frame with jacking load were used for the test of model piled raft system. A total of 20 tests were conducted to study the load settlement characteristics of a piled raft foundation with the use of piles as settlement reducers. …”
Get full text
Final Year Project (FYP) -
10
Load settlement characteristics of a piled raft in sand
Published 2010“…Experimental results have shown that increasing the number of piles, lengthening the piles and increasing the pile spacing in a piled raft will lower its settlement. …”
Get full text
Final Year Project (FYP) -
11
Finite element analysis of piles as settlement reducers in raft foundation
Published 2019“…Piled raft foundation with settlement-reducing piles is a feasible and economical alternative to reducing both the total and differential settlements of raft by considering the bearing capacity contributions from raft and piles. …”
Get full text
Final Year Project (FYP) -
12
GE-26 use of jet grouted pile in deep braced excavation
Published 2016“…This project is a study of the behavior of the wall in braced excavation system in the presence of the jet grouted piles (JGP). Jet grouting is the soil-improvement technique that aims to improve the soil characteristics. …”
Get full text
Final Year Project (FYP) -
13
A comparison of eurocodes and BS codes in the design of vertically loaded piles in sand
Published 2013Get full text
Final Year Project (FYP) -
14
3D finite element analysis of the effects of deep excavation on adjacent piles
Published 2019“…By using a validated three-dimensional finite element analysis method to analyse the impacts of soil properties, pile diameters, lateral distance between the excavation face and existing pile, and the position of single existing piles around the perimeters of excavation on the lateral movement (Ux), axial force(N) and bending moment (M) of the adjacent piles. …”
Get full text
Final Year Project (FYP) -
15
Comparison between Eurocode 7 and British Standard in pile design under mixed ground condition
Published 2013“…Pile foundation is extensively used in Singapore construction projects. …”
Get full text
Final Year Project (FYP) -
16
Analysis of p-y curves of sand and clay using PLAXIS 3D
Published 2019“…In this study, PLAXIS 3D is used to simulate the lateral translation of a long and rigid pile in sands and clays. In this paper, the p-y curves are obtained from the shear profile of the laterally translated pile, and are then normalised such that its horizontal and vertical axis are dimensionless. …”
Get full text
Final Year Project (FYP) -
17
The effect of JGP slab on the stability of deep excavation
Published 2015“…In this project, two-dimensional simulations via software PLAXIS 2D were carried out using finite element method, to evaluate the performance of jet grouted piles during a deep excavation. The thickness and arrangement of the jet grouted slabs will be varied while maintaining the depth and width of excavation. …”
Get full text
Final Year Project (FYP) -
18
Earth pressure distribution in a braced excavation
Published 2017“…Mohr-Coulomb with linearly elastic-perfectly plastic material model was used with 3 types of undrained shear strength increasing with depth. Three sheet pile walls and diaphragm walls were also used as parameter. …”
Get full text
Final Year Project (FYP) -
19
Lessons from the back analysis of Nicoll Highway incident
Published 2021“…The use of Jet-grouted Piles (JGP) has gained popularity in Singapore when excavating in soft soil; it is a soil-improvement method that improves the soil characteristics. …”
Get full text
Final Year Project (FYP)