1
Experimental study on piles as settlement reducers in model piled rafts
Published 2012“…Although raft foundation may meet the requirement of bearing capacity easily, it tends to settle excessively and exceed the serviceability requirement. As such, piled raft foundation was first introduced by Burland et al. (1977) mainly to reduce the settlement to within allowable range, based on the introduction of composite foundation made up of a raft and some piles by Davis and Poulos (1972). …”
Get full text
Final Year Project (FYP) -
2
Experimental study on piles as settlement reducers in modeled piled raft
Published 2012“…This study examines the effect of piled raft and raft resting on pile reinforced sand. …”
Get full text
Final Year Project (FYP) -
3
Finite element analysis of piled raft : load transfer through piles and raft
Published 2011Get full text
Final Year Project (FYP) -
4
Analysis of piled raft behavior
Published 2010“…The main objective of this project is to study the behavior of piled raft foundation system and analyze how piles are being designed optimally to control the displacements the foundation system. …”
Get full text
Final Year Project (FYP) -
5
A comparison of Eurocodes and BS codes in the design of vertically loaded pile (b) : pile founded in clay
Published 2013“…Pile design using British standards (BS8004:1986) will soon be replaced by Eurocode 7 (EC7). …”
Get full text
Final Year Project (FYP) -
6
Interpretation of pile load test results
Published 2009“…This project is titled ‘Interpretation of Pile Load Tests Results’. So what this project is really about is what can be presumed from the results of the pile load tests. …”
Get full text
Final Year Project (FYP) -
7
Three-dimensional analysis of pile behaviour
Published 2010“…Often, any form of ground activities will have an influence on the structures which the ground carries and in some instances of piles, an induced lateral load may act on the piles. …”
Get full text
Final Year Project (FYP) -
8
Determination of pile damages by an integrity testing
Published 2011“…In Singapore, concrete bored piles (CBP) are commonly used in various construction projects. …”
Get full text
Final Year Project (FYP) -
9
Finite element analysis of piled raft
Published 2011“…Piled Raft foundations are often seen as a more economical and superior foundation system compared to single foundation since it takes into account contributions of both the pile and raft. …”
Get full text
Final Year Project (FYP) -
10
Pile design using eurocode 7
Published 2014“…Parametric studies were conducted to investigate the pile resistance for specific pile geometries and pile lengths required for a specific loading using both ‘Model Pile’ procedure and ‘Alternative’ procedure. …”
Get full text
Final Year Project (FYP) -
11
Analysis of soil arching in piled embankments
Published 2018“…This project investigates the soil arching behaviour in piled embankments on soft ground. Stress is transferred from a yielding mass of the soft ground to adjacent piles with greater stiffness. …”
Get full text
Final Year Project (FYP) -
12
Finite element analysis of pile-reinforced slopes
Published 2019“…In this project the effects of pile location, pile spacing, and effects of pile length, pile diameter and pile head boundary conditions are studied to assess the factor of safety of the pile stabilized slope. …”
Get full text
Final Year Project (FYP) -
13
Load settlement characteristics of piled rafts in sand
Published 2011“…This study investigates the effects of pile numbers, pile length, pile spacing and pile diameters on the load-settlement response of a piled raft in dense sand through model tests. …”
Get full text
Final Year Project (FYP) -
14
Numerical analysis and design of laterally loaded piles
Published 2012“…The finite element or finite difference methods are commonly used to determine the reponse of single vertical piles under lateral loading. Various programs, such as COM624P, LPILE and FB-MultiPier, are used, to analyze the response of single vertical pile under lateral loading. …”
Get full text
Final Year Project (FYP) -
15
Design of pile foundations using Eurocode 7
Published 2012“…The common types are driven piles and bored piles. This project explores the design of bored piles in conjunction with newer introduction of the new Eurocode 7. …”
Get full text
Final Year Project (FYP) -
16
Behavior of cold formed steel sheet piles
Published 2013“…Steel sheet pile are fabricated by either hot-rolled process or cold-formed process. …”
Get full text
Final Year Project (FYP) -
17
Behavior of cold-formed steel sheet piles
Published 2013“…Steel sheet piles have been used since even before modern construction and technology. …”
Get full text
Final Year Project (FYP) -
18
Analysis of slope-stabilizing piles in clay slopes
Published 2019“…The slope gradient used in this study is 1:3. The pile parameters studied include the pile spacing, pile diameter and pile length, and the thickness of the weak clay layer. …”
Get full text
Final Year Project (FYP) -
19
Behaviour of laterally loaded piles near a slope
Published 2020“…Hence, this paper provides a parametric study of soil and pile properties in order to gain a better understanding on the lateral pile capacity beside a slope. …”
Get full text
Final Year Project (FYP) -
20
Finite element analysis of anchored sheet-pile wall
Published 2009“…For anchored sheet pile walls, the classical method of determining depth of penetration can be done using limit equilibrium. …”
Get full text
Final Year Project (FYP)