-
1
ANALISIS CAPACITY CONSTRAINED WORKER (CCW) DENGAN PENDEKATAN WAKTU BAKU DAN DENYUT JANTUNG PEKERJA (STUDI PADA : INDUSTRI TEMPE �MUCHLAR�KASIHAN BANTUL YOGYAKARTA)
Published 2013“…This study aims to identify the worker happens Capacity constrained approach of standard time and may determine the appropriate improvements to increase capacity This study was conducted to quantify and determine the factors that affect the capacity of workers such as heart rate, standard time workers and the environment. …”
Thesis -
2
PENENTUAN JUMLAH TENAGA KERJA TEORITIS DI STASIUN PENGEMASAN PT. RUMPUN SARI KEMUNING I KARANGANYAR MENGGUNAKAN METODE STUDI WAKTU
Published 2014“…By knowing the cycle time, normal time, and standard time so can be determined the amount of theoretically labor. …”
Thesis -
3
PENENTUAN WAKTU BAKU PROSES PRODUKSI TAHU DI CV. SUMBER MAKMUR, SRAGEN, JAWA TENGAH
Published 2013“…To find the amount of time used during all operations, standard time calculation becomes necessary so that the company can calculate the number of tofu produced within a day. …”
Thesis -
4
PENENTUAN JUMLAH PEKERJA BERDASARKAN WAKTU BAKU (Studi di Bagian Produksi GNP Snack, Muntilan)
Published 2013“…Because the target is not working optimally, it is necessary to research on the determination of the optimal amount of labor by measuring the cycle time for every activity Ceriping Cassava production process to obtain the standard time. In determining the standard time, of course, the adjustment factors and factors to consider leniency. …”
Thesis -
5
PENENTUAN JUMLAH TENAGA KERJA DI STASIUN PENGEMASAN BERDASARKAN STUDI WAKTU STANDAR DI CV. BINA AGRO MANDIRI
Published 2014“…This research was conducted which aimed to measure the workers standard time in respective packaging station operation, and to determine the number of the workers in the packaging stations based on the standard time. …”
Thesis -
6
PENENTUAN JUMLAH KEBUTUHAN TENAGA KERJA BERDASARKAN WAKTU BAKU PADA PROSES PENGOLAHAN ABON SAPI (Di Industri Rumah Tangga Pengolahan Makanan Merk �Bu Rejo�)
Published 2013“…Analysis used for the calculation of standard time using the cycle time of each work station. …”
Thesis -
7
PENENTUAN KEBUTUHAN TENAGA KERJA PADA STASIUN PENGEMASAN PT PERKEBUNAN NUSANTARA IX (PERSERO) PG GONDANG BARU
Published 2014“…The method used in determining the manpower requirements using study time by finding the normal time and standard time. Standard time is used to determine the number of workers at the work station packing. …”
Thesis -
8
Prestasi Kerja Di Bidang Pemanenan Hasil Hutan Di Hutan Jati
Published 2001“…The method use selective operating time (SOT), normal time, allowance and standard time approach. Productivity calculated with divided working result by standard time. …”
Article -
9
PENENTUAN JUMLAH TENAGA KERJA PADA STASIUN PENGEMASAN DI UNIT PENGOLAHAN SEKUNDER PT PERKEBUNAN NUSANTARA IX (PERSERO) PABRIK KOPI BANARAN
Published 2013“…The method used in this study using the time to study for the normal time and standard time. Furthermore, each standard time each work element is used to determine the amount of labor in the packing work station. …”
Thesis -
10
Menguji sistem waktu*
Published 1995“…INTISARI Sistem waktu yang digunakan dalam kehidupan seharihari, seperti WIB, WITa, WIT dll. disebut waktu standard setempat (local standard time, LST). Jadi jam yang kita pakai sehari-hari haruslah disesuaikan dengan salah satu sistem waktu tsb. …”
Article -
11
Pembelajaran Masyarakat Dalam Pengurangan Risiko Bencana di Ternate
Published 2008“…The result of simulation took time less than 2 hours, the standard time for evacuation can be used as a model for evacuation time in real condition. .…”
Article -
12
KINERJA SPEKTROMETER FOTOAKUSTIK DALAM KARAKTERISASI SCRUBBER GAS C2H4
Published 2013“…Six adsorptivity parameters of the scrubber i.e. the effect of concentration of active agent and ethylene gas standard, time of storing, speed of gas flowing, heating treatment and determination of adsorption capacity had been characterized. …”
Thesis -
13
Repetitive Task Analysis in Cutting Label of Shuttlecock Process Using Assessment of Repetitive Task Tool: Case Study in Jago Jaya Shuttlecock Industry
Published 2020“…Because of this, it is necessary to design a label cutting tool that aims to reduce the length of the cutting process and the resulting repetitive motion. This study uses standard time calculation to calculate the time required for the cutting process using the current tool, ART Tools to assess risk factors that are the focus of tool design needs, and analysis of movements using a map of the left hand and right hand. …”
Get full text
Conference or Workshop Item -
14
PENINGKATAN EFISIENSI DAN PRODUKTIVITAS KERJA PADA PRODUKSI KERAJINAN PERAK (Studi kasus : Salim Silver Kota Gede)
Published 2014“…After that, calculating the standard time to determine the level of efficiency and productivity of the work station, and made observations on each production process at this work station. …”
Thesis -
15
PENGARUH PENGELOLAAN AIR, PEMUPUKAN KALIUM DAN POLA PERTANAMAN TERHADAP HASIL JAGUNG DAN KACANG HIJAU DI LAHAN KERING
Published 2013“…Sub - sub plot, the time of maize relay, consisting of 2 standards: time of maize relay 60 and 70 days after planting first maize. …”
Thesis