Showing 861 - 880 results of 1,247 for search '((((pinna OR pinn) OR bina) OR shen) OR (((span OR pgk) OR (ssspinga OR ssspenga)) OR ping))', query time: 0.21s Refine Results
  1. 861

    Conflict and contract use in cross-cultural buyer–supplier relationships: the role of cultural context by Roehrich, J, Sarafan, M, Squire, B, Lawson, B, Bouazzaoui, M

    Published 2024
    “…Conflict is common within global supply chains, especially where the buyer and supplier span different cultures. In such settings, formal contracts assume an important role in providing a common language that specifies each party's roles, responsibilities, and liabilities. …”
    Journal article
  2. 862

    Practices, attitudes and motives for domestic waste recycling by Aini, M. S., Fakhru'l-Razi, A., Lad, S. M., Hashim, A. H.

    Published 2002
    “…The 15 000 tonnes of garbage produced daily are thrown into 230 landfills nationwide, where 80% of them have only two years of life span left. Although recycling programmes were launched as early as 1990, only 5% of the wastes are recycled. …”
    Article
  3. 863

    Estimation of crown characters and leaf biomass from leaf litter in a Malaysian canopy species, Elateriospermum tapos (Euphorbiaceae) by Osada, Noriyuki, Takeda, Hiroshi, Kawaguchi, Hideyuki, Furukawa, Akio, Awang, Muhamad

    Published 2003
    “…Leaf fall rate was estimated to be 2.0-28.1 kg per tree per year in the five trees of various heights, and was greater in taller trees. Since leaf life span was smaller for taller trees, leaf biomass was estimated to be 2.6-30.5 kg per tree, and was also greater in taller trees. …”
    Get full text
    Article
  4. 864

    How do you predict your future movement and locations? by Ko, Zhan Hong

    Published 2014
    “…The data collection process spanned over a total duration of two and a half months from the 1st of January to the 15th of March. …”
    Get full text
    Final Year Project (FYP)
  5. 865
  6. 866
  7. 867
  8. 868
  9. 869
  10. 870

    Combinatorial algorithms for scheduling jobs to minimize server usage time by Ren, Runtian

    Published 2018
    “…The Flexible Job Scheduling problem aims at determining the starting times of flexible jobs that do not have to be started immediately at their arrivals to minimize the span of all the jobs, where the span is the time duration in which at least one job is running. …”
    Get full text
    Get full text
    Thesis
  11. 871
  12. 872
  13. 873

    My research career by Ma, Xueliang

    Published 2024
    “…I was learning ancient Chinese graphology and Chinese historical semantics from Professor Shen Jianshi and Professor Tang Lan. By that time, I was engaged in studying Fangyan, a book by the Western Han author Yang )(tong. which purports to be an amalgamation and commentary on various dictionaries. …”
    Get full text
    Journal Article
  14. 874

    Resolving structural ambiguity using animacy and grammatical cues in Chinese. by Ong, Deborah Yoke Ting.

    Published 2012
    “…Some languages show preference for high attachment (the servant) while other languages such as Chinese has shown a preference for low attachment (the actress) (Shen, 2006). The role of animacy has also been found to be relevant in Chinese, with studies on the Competition Model supporting it as an important cue in agent identification (Bates et al., 1992). …”
    Get full text
    Final Year Project (FYP)
  15. 875
  16. 876

    EBG antenna design by Ma, Xinqi

    Published 2015
    Get full text
    Final Year Project (FYP)
  17. 877

    Data-driven methods to predict the stability metrics of catalytic nanoparticles by Prabhu, Asmee M., Choksi, Tej S.

    Published 2023
    “…Ab initio methods can calculate these metrics but are computationally intensive due to the large configurational space that these nanostructures span. Moreover, sub-nanometer nanoparticles are structurally flexibile under reaction conditions. …”
    Get full text
    Journal Article
  18. 878

    Intermittent demand forecasting by Mishra, Prerna.

    Published 2013
    “…The project paper deals with comparative assessment of the of forecast for “in-sample” as well as “out of sample” periods derived by various methods of intermittent demand forecasting on historical data set of fifteen hundred products for a span of twenty four months obtained by several numerical modelling tools – classical to contemporary and evaluate the superiority of models by comparison of achievement of different methods in respect of degree of accuracy of forecast for future periods and judge the robustness of forecasting methodology.…”
    Get full text
    Final Year Project (FYP)
  19. 879

    Development of communication links between unmanned aerial vehicles (UAVs) and UAV traffic management (UTM) systems via the cellular network by Holmberg, Carl Oswald

    Published 2016
    “…The usefulness of such vehicles span many areas, as it advantageously aids in areas ranging from, agricultural monitoring, surveillance and even to goods delivery. …”
    Get full text
    Final Year Project (FYP)
  20. 880

    Heat transfer study of a cold plate with fractal designs by Ow Yong, Daniel Zhao Yi

    Published 2018
    “…A new experiment rig was built and experimental investigations were carried out using the rig for the entire span of the project. A test on the reliability of the experiment rig was conducted using the numerical simulation software “COSMOL Multiphysics”. …”
    Get full text
    Final Year Project (FYP)