-
181
Finite element modelling of ultrasonic non-destructive testing
Published 2009“…Extensive literature review was done and the process and results of the project have been documented here to the author’s best ability.…”
Get full text
Final Year Project (FYP) -
182
Effect of queuing and priority rules in semiconductor testing workstation
Published 2011“…The object of this study is the queuing system in the testing company. There are several approaches for queuing system such as: modeling, mathematical, etc. …”
Get full text
Final Year Project (FYP) -
183
-
184
CSS-like constructions of asymmetric quantum codes
Published 2019Subjects: Get full text
Get full text
Journal Article -
185
Web-based adaptive testing system for C programming
Published 2014“…To cope with this problem, Computerised Adaptive Testing (CAT) and Test Paper Generation (TPG) techniques have been used to eliminate some of these restrictions. …”
Get full text
Final Year Project (FYP) -
186
Performance testing of steam ejector air conditioning system
Published 2010“…With increased concern for global warming and environmental damage, there has been heated interest in this field. Steam ejector refrigeration system makes use of low grade thermal energy or waste heat to generate cooling. …”
Get full text
Final Year Project (FYP) -
187
UAV-borne radar RF transceiver design and testing
Published 2016“…For the last two years, staff from Temasek Laboratory@NTU and some EEE students have been working on a multi-rotor based FMCW synthetic aperture radar system. …”
Get full text
Final Year Project (FYP) -
188
Performance testing of vapor compression system of aircon system
Published 2010“…Following that, various tests were carried out and analyzed before determining the range of COP. …”
Get full text
Final Year Project (FYP) -
189
A large scale test of the gaming-enhancement hypothesis
Published 2016“…Our aim was to examine the relations between young people’s gaming experiences and an objective test of reasoning performance. Using a Bayesian hypothesis testing approach, evidence for the gaming-enhancement and null hypotheses were compared. …”
Get full text
Get full text
Journal Article -
190
Study of impact properties of materials by instrumented impact testing
Published 2009“…Impact toughness improvement arising from delaminations has been studied by some researchers. However, the previous investigations were limited in scope because the impact testing was non-instrumented and the specimens used contained weak interfaces made artificially either by soldering thin mild steel plates together or by laminating high-strength titanium alloys and maraging steels. …”
Get full text
Thesis -
191
-
192
Development and Execution of a Testing Strategy for Omnidirectional Wheels
Published 2024“…Here, test methods are described for characterizing the load relaxation, stiffness, and rolling resistance of omnidirectional wheels, and the results from these tests are presented. …”
Get full text
Thesis -
193
MobiTest : an evaluation infrastructure for mobile distributed applications
Published 2013Get full text
Thesis -
194
Timoshenko beam effect in flexural resonant column tests
Published 2020“…Current methods for deriving Young's modulus (E) from flexural resonant column tests do not account for the Timoshenko beam effect. …”
Get full text
Journal Article -
195
Design of test setup for asynchronous digital signal processor
Published 2009“…This poses special challenges in testing and verification. In this report, a test setup was designed on Altera DE2 FPGA board to allow for testing and verification of an asynchronous chip. …”
Get full text
Final Year Project (FYP) -
196
Mechanical and vibrational testing of clamped rail steel assembly
Published 2022“…In this paper, a setup with 2 broken rails and 4 clamps were replicated in the laboratory to perform vibration testing on. Experiments were conducted, changing parameters of the setup systematically to find out the cause and effects of each parameter. …”
Get full text
Final Year Project (FYP) -
197
Development of software testing and analysis tools : Part A
Published 2009“…Recently, Ngo and Tan has proposed a method for the detection of infeasible paths [10] depicting 4 programming patterns that will lead to infeasible paths during testing. The patterns are: • Identical/Compliment-Decision Pattern • Mutually-Exclusive-Decision Pattern • Check-then-Do Pattern • Loop-by-Flag Pattern The scope of this project is to create a set of tools to facilitate detecting of such infeasible paths by detecting the conditions that fulfill the patterns mentioned above. …”
Get full text
Final Year Project (FYP) -
198
Automated shielding effectiveness test system for shielded enclosures
Published 2010“…Tests are carried out on shielded enclosures to determine their shielding effectiveness capability before they are commissioned. …”
Get full text
Thesis -
199
-
200
Numerical simulation of static load test on barette piles
Published 2010“…Pile load tests are often conducted to determine the ultimate load capacity for deep foundations. …”
Get full text
Final Year Project (FYP)