Search alternatives:
handa » chanda (Expand Search), handai (Expand Search), khanda (Expand Search)
khandai » kchandai (Expand Search), khandaii (Expand Search), kkhandai (Expand Search), khandaq (Expand Search), handai (Expand Search), khanda (Expand Search)
bonds » bond (Expand Search)
land » hand (Expand Search)
bander » blander (Expand Search), brander (Expand Search), binder (Expand Search)
prrpaceh » prrspaceh (Expand Search), prrfaceh (Expand Search), prrpageh (Expand Search)
pace » space (Expand Search), face (Expand Search), page (Expand Search)
handa » chanda (Expand Search), handai (Expand Search), khanda (Expand Search)
khandai » kchandai (Expand Search), khandaii (Expand Search), kkhandai (Expand Search), khandaq (Expand Search), handai (Expand Search), khanda (Expand Search)
bonds » bond (Expand Search)
land » hand (Expand Search)
bander » blander (Expand Search), brander (Expand Search), binder (Expand Search)
prrpaceh » prrspaceh (Expand Search), prrfaceh (Expand Search), prrpageh (Expand Search)
pace » space (Expand Search), face (Expand Search), page (Expand Search)
-
1
Land reclamation without using soil-fills
Published 2016“…In order to sustain the fast-paced economic development and urbanisation, an increasing emphasis has been placed on land reclamation projects. …”
Get full text
Final Year Project (FYP) -
2
The transfer and maximisation of dry-land strength & power into in-water thrust in competitive swimming
Published 2019“…Participants also completed a 25-m swim using the Aquanex Analysis System at slow, moderate and all-out pace with the front-crawl stroke. RESULTS: Significant correlation (p < 0.05) were found between dry-land power and in-water swimming power at all three swim speeds. …”
Get full text
Final Year Project (FYP) -
3
-
4
Urban intensity parameterisation
Published 2021“…The fast pace of urbanisation has led to the rapid development of high-density urban systems. …”
Get full text
Final Year Project (FYP) -
5
Evolution of emergency management in Malaysia
Published 2001“…Safety and emergency laws and regulations in Malaysia had evolved in pace with the development and industrialisation of the country. …”
Get full text
Article -
6
Development of indexing clamper mechanism for wire bonder
Published 2008“…For wire bonding integrated circuits, the state-of-art is 30 u.m fine pitch, and the position accuracy of material transmission for wire bonder is required to be 3.5 urn or less. …”
Get full text
Thesis