Search alternatives:
lfast » fast (Expand Search), last (Expand Search), zfast (Expand Search)
zlpast » zleast (Expand Search)
lfast » fast (Expand Search), last (Expand Search), zfast (Expand Search)
zlpast » zleast (Expand Search)
-
21
-
22
-
23
Optimal leak factor selection for the output-constrained leaky filtered-input least mean square algorithm
Published 2020“…The leaky filtered-input least mean square (LFxLMS) algorithm is widely used in active noise control applications to minimize the degradation of attenuation performance due to output saturation distortion. …”
Get full text
Journal Article -
24
-
25
-
26
-
27
-
28
-
29
-
30
-
31
Interactive partitioning of 3D models into printable parts
Published 2020“…This article presents an easy, flexible and interactive tool for partitioning a 3D model, which is larger than a 3D printers working volume, into printable parts in an intuitive way. Our tool is based on the elegant partitioning optimization framework Chopper. …”
Get full text
Journal Article -
32
Development of software testing and analysis tools : Part A
Published 2009Get full text
Final Year Project (FYP) -
33
Simulation tool for learning signals and systems - part 1
Published 2023“…This project Simulation Tool for Learning Signals and Systems – Part 1 is designed to aid students in learning part 1 of the module. …”
Get full text
Final Year Project (FYP) -
34
Deep learning for communication signal classification – part A
Published 2023Get full text
Final Year Project (FYP) -
35
Failures in computer contracts in the Eastern part of the United States.
Published 2014Get full text
Final Year Project (FYP) -
36
Design and development of solar powered glider - part c
Published 2016Get full text
Final Year Project (FYP) -
37
SMARTEYE - for human posture and activity monitoring Part 2
Published 2016Get full text
Final Year Project (FYP) -
38
Deployment and test of microgrid power park - part II
Published 2018“…The project will be using a voltage source inverter to convert DC to AC power and other parts of the power converter system will be simulated through MATLAB and Control desk.…”
Get full text
Final Year Project (FYP) -
39
“Materials Science” Challenges in the Additive Manufacturing of Industrial Parts
Published 2016“…The effect of successive thermal cycles, as induced by the heat source moving away from an already deposited metal further adds to the overall challenge of fabricating parts with industry-compliant physical, mechanical, and electrochemical properties and proper dimensional controls. …”
Get full text
Get full text
Conference Paper -
40
Daily allocation of energy consumption forecasting of a power distribution company using optimized least squares support vector machine
Published 2025“…This study presents a novel approach for optimal allocation forecasting of energy consumption in a power distribution company, utilizing the Least Squares Support Vector Machine (LSSVM) optimized by novel variants of the Barnacle Mating Optimizer (BMO) such as the new Gooseneck Barnacle Optimizer and Selective Opposition-based constrained BMO. …”
Get full text
Article