Showing 861 - 880 results of 4,405 for search '(((pin OR (ping OR peng)) OR (sspine OR pinned)) OR ((pink OR spink) OR ((ling OR line) OR link)))', query time: 0.24s Refine Results
  1. 861
  2. 862

    Bit-error-rate analysis of UWB radio using BPSK modulation over inter-chip radio channels for wireless chip area networks by Chen, Zhiming, Zhang, Yue Ping, Hu, Ai Qun, Ng, Tung Sang

    Published 2010
    “…Besides, the link margin analysis shows that a link margin of 28.22 dB could be obtained for the same distance and data rate.…”
    Get full text
    Get full text
    Journal Article
  3. 863

    Distributed local linear parameter estimation using gaussian SPAWN by Leng, Mei, Tay, Wee Peng, Quek, Tony Q. S., Shin, Hyundong

    Published 2019
    “…We show that gSPAWN converges in mean and has mean-square stability under some technical sufficient conditions, and we describe an application of gSPAWN to a network localization problem in non-line-of-sight environments. Numerical results suggest that gSPAWN converges much faster in general than the diffusion method, and has lower communication costs per sensor, with comparable root-mean-square errors.…”
    Get full text
    Get full text
    Journal Article
  4. 864

    Resilient power systems operation with offshore wind farms and cloud data centers by Liu, Shengwei, Li, Yuanzheng, Liu, Xuan, Zhao, Tianyang, Wang, Peng

    Published 2024
    “…The static power curve of wind turbines (WTs) is used to capture the output of OWFs, and the fragility analysis of transmission-line components is used to formulate the time-varying failure rates of transmission lines. …”
    Get full text
    Journal Article
  5. 865

    Strategic production process design with additive manufacturing in a make-to-stock environment by Chua, Ping Chong, Moon, Seung Ki, Ng, Yen Ting, Lopez, Manet

    Published 2023
    “…With AM suitable for small volumes of highly customized production, there are various ways of implementing AM in a conventional production line. The aim of this paper is to present a strategic design approach to implementing AM with conventional manufacturing in a complementary manner for parallel processing of production orders of large quantities in a make-to-stock environment. …”
    Get full text
    Journal Article
  6. 866
  7. 867
  8. 868
  9. 869
  10. 870
  11. 871
  12. 872
  13. 873
  14. 874
  15. 875
  16. 876
  17. 877
  18. 878
  19. 879
  20. 880