Showing 201 - 220 results of 641 for search '(((ping OR eng) OR ((spine OR line) OR (spenge OR speng))) OR ((pings OR (pins OR fins)) OR pin))', query time: 0.09s Refine Results
  1. 201

    Smart distribution board overload detector by using microcontroller by Mohammad Azmi, Nurfiza Atikah, Mohd Jamail, Nor Akmal, Othman, Nordiana Azlin, Ismail, Muhammad Nafis, Kamarudin, Qamarul Ezani

    Published 2020
    “…A statistic by Economic Planning Unit (EPU) on the electricity growth in Malaysia has shown an increment in line with economic growth [1]. In line with government policies, the energy supply industry has been molding itself to cater to the rapid development of the nation in hopes of creating a better and smarter nation [2]. …”
    Get full text
    Book Section
  2. 202

    High selectivity UWB bandpass filter with a wide notched-band by Borhani, Seyyed Jamal, Honarvar, M. Amin, Virdee, Bal Singh

    Published 2015
    “…The proposed filter structure is composed of a U-shaped open-circuited line that is interdigitally coupled to the input/output feed-lines using high impedance lines. …”
    Get full text
    Article
  3. 203

    Recommended protection scheme setting coordination for nine busbars transmission grid by Saleem, Radhwan Mohammed

    Published 2015
    “…For protection of transmission line three stepped distance protection can provide remote backup protection to transmission line by zone 2 and zone 3, but during the calculation of operation setting for different protection zones of the distance relays, some problems have been raised (overlap and under reach). …”
    Get full text
    Get full text
    Get full text
    Thesis
  4. 204

    Blackspot analysis of road traffic crashes in Surabaya - Manyar Toll Road, East Java by Hartatik, Nurani, Prasetijo, Joewono, Muslihati, Atqiya

    Published 2021
    “…The locations of crash-prone points (Blackspots) on the Surabaya - Manyar Toll road are as follows: The locations of crash-prone points (Blackspots) on the Surabaya Toll road - Manyar line mostly occurred at Km 9 + 925 - 16 + 400 mostly in 2018, on the Romokalisari - Kebomas section, and for Manyar - Surabaya line, occurred at Km 3 + 500 - 0 + 000 mostly in 2016, on the Tandes - Dupak section. …”
    Get full text
    Conference or Workshop Item
  5. 205
  6. 206
  7. 207
  8. 208
  9. 209
  10. 210
  11. 211

    Diagonal quasi-Newton methods via least change updating principle with weighted Frobenius norm by Leong, Wah June, Enshaei, Sharareh, Kek, Sie Long

    Published 2021
    “…This paper presents a class of low memory quasi-Newton methods with standard backtracking line search for large-scale unconstrained minimization. …”
    Get full text
    Article
  12. 212
  13. 213

    Dual band monopole antenna with harmonic suppression capability by Mohamed Abdirahman, Abdiaziz

    Published 2018
    “…In order to reduce the harmonic of the antenna. The stub loaded feed line was proposed. Three different length stubs were attached with the antenna feed line in order to suppress the harmonics on the patch antenna. …”
    Get full text
    Get full text
    Get full text
    Thesis
  14. 214
  15. 215

    Transmission service charge methodology for pool power market by Nur Hanis, Mohammad Radzi

    Published 2009
    “…In addition, the development of transmission service charges also has to be fair and equitable to the transmission line users.…”
    Get full text
    Thesis
  16. 216
  17. 217
  18. 218
  19. 219
  20. 220