Showing 1,421 - 1,440 results of 6,540 for search '(((site OR fine) OR (pinge OR like)) OR ((sains OR (sspina OR ssspina)) OR pin))', query time: 0.17s Refine Results
  1. 1421
  2. 1422
  3. 1423
  4. 1424
  5. 1425
  6. 1426
  7. 1427
  8. 1428
  9. 1429
  10. 1430
  11. 1431

    Generalized self-cueing real-time attention scheduling with intermittent inspection and image resizing by Liu, Shengzhong, Fu, Xinzhe, Hu, Yigong, Wigness, Maggie, David, Philip, Yao, Shuochao, Sha, Lui, Abdelzaher, Tarek

    Published 2023
    “…One limitation of our original self-cueing-and-inspection strategy (Liu et al. in Proceedings of the 28th IEEE real-time and embedded technology and applications symposium (RTAS), 2022b) lies in its lack of computational efficiency under high workloads, like busy traffic scenarios where a large number of objects are identified and separately inspected. …”
    Get full text
    Article
  12. 1432

    Interplay of Transition Metals and Noncovalent Interactions in C–H Activation Catalysis by Vennelakanti, Vyshnavi

    Published 2024
    “…While the oxidation and spin states of the metals in the enzyme active site are well defined through spectroscopic methods, that is not the case with TMC catalysts. …”
    Get full text
    Thesis
  13. 1433

    Efficient nitrate synthesis via ambient nitrogen oxidation with Ru-doped TiO₂/RuO₂ electrocatalysts by Kuang, Min, Wang, Yu, Fang, Wei, Tan, Huiteng, Chen, Mengxin, Yao, Jiandong, Liu, Chuntai, Xu, Jianwei, Zhou, Kun, Yan, Qingyu

    Published 2022
    “…Remarkably doping Ru into the TiO2 lattice can induce an upshift of the d-band center of the Ru site, resulting in enhanced activity for accelerating electrochemical conversion of inert N2 to active NO*. …”
    Get full text
    Journal Article
  14. 1434
  15. 1435
  16. 1436
  17. 1437
  18. 1438
  19. 1439
  20. 1440

    Vision feedback on freeform-shaped structure for 3D printing by Quah, Noel Tan Kai

    Published 2024
    “…The current construction approach in Singapore’s high density urban landscape is the use of Prefabricated Prefinished Volumetric Construction (PPVC), where 3-dimensional modules with completed finishes, fixtures, and fittings are fabricated in a decentralised facility prior to its delivery and designated on-site installation. This construction method has benefited the populous with reduced environmental pollutants and reduced reliance to on-site personnel, while lowering exposure to construction site health hazards. …”
    Get full text
    Thesis-Doctor of Philosophy