Showing 81 - 100 results of 16,083 for search '((cers OR cheers) OR (been OR (((leads OR beams) OR lead) OR year)))', query time: 0.21s Refine Results
  1. 81

    Mixed lead-tin perovskite films with >7 μs charge carrier lifetimes realized by maltol post-treatment by Hu, S, Truong, MA, Otsuka, K, Handa, T, Yamada, T, Nishikubo, R, Iwasaki, Y, Saeki, A, Murdey, R, Kanemitsu, Y, Wakamiya, A

    Published 2021
    “…Mixed lead–tin (Pb–Sn) halide perovskites with optimum band gaps near 1.3 eV are promising candidates for next-generation solar cells. …”
    Journal article
  2. 82
  3. 83
  4. 84
  5. 85

    A comparative study of lead-acid battery against other battery types for distributed energy storage application in power systems by Norzita Sulaiman.

    Published 2012
    “…This project considered the study of lead-acid batteries in comparing with sodium sulphur (NaS) batteries, Lithium Ion (Li-ion) batteries and Flow batteries in terms of battery technologies and also the energy storage application in power systems. …”
    Get full text
    Final Year Project (FYP)
  6. 86
  7. 87
  8. 88
  9. 89
  10. 90

    A deterministic mechanism for efficient removal of arsenic and lead from wastewater using rapidly synthesized TiO2-(α-Fe2O3) nanoshells by Alshammari, Teflah K., Ghoshal, Sib Krishna, Bakhtiar, Hazri, Alhajj, Mahmood, Salim, Ali Aqeel, Alias, Siti Salwa

    Published 2024
    “…The removal of arsenic and lead from wastewater by TNPs, FNPs and TFNSs were explained using a possible mechanism. …”
    Article
  11. 91

    A new design of a compact strontium cold-atom source by Xu, D

    Published 2020
    Subjects: “…Atomic beams…”
    Thesis
  12. 92
  13. 93

    The new physics case for beam-dump experiments with accelerated muon beams by Cesarotti, Cari, Gambhir, Rikab

    Published 2024
    “…An economical and efficient possibility is to use the accelerated muon beam from either the full experiment or from cooling and acceleration tests in beam-dump experiments. …”
    Get full text
    Article
  14. 94

    The MFA years by Desker, Barry

    Published 2022
    Get full text
    Book Chapter
  15. 95

    Beam studies using a Cherenkov diffraction based beam position monitor for AWAKE by Spear, B, Burrows, PN, Pakuza, C, Senes, E, Mazzoni, S, Lefevre, T, Wendt, M

    Published 2024
    “…These ChDR BPMs have undergone renewed testing under a variety of beam conditions with proton and electron bunches in the AWAKE common beamline, at 3 different frequency ranges between 20-110 GHz to quantify the effectiveness of discriminating the electron beam position with and without proton bunches present. …”
    Conference item
  16. 96

    Final year project by Feng, Xiang

    Published 2015
    “…Nowadays, music has been transferred from traditional media to modern formats, such as MP3 and so on. …”
    Get full text
    Final Year Project (FYP)
  17. 97
  18. 98
  19. 99

    Large deflection of composite beams in bending by Teo, Chin Yao

    Published 2021
    “…The goal of this project is to investigate large deflection response and behavior of composite beams. Composite beams are first fabricated out of AX-5112T, a bidirectional woven repreg. …”
    Get full text
    Final Year Project (FYP)
  20. 100

    Performance testing of active thermosiphon beams by Yeo, Adeline Xin Yi

    Published 2017
    “…Conventional Heating, Ventilation and Air-Condition (HVAC) system uses Variable Air Volume (VAV) which requires a substantial amount of energy. Therefore, in recent years, there is more emphasis on Active and Passive Thermosiphon Beam (ATB/PTB) as these beams grant energy saving, cost reduction, indoor environment quality improvement, reduced space requirements etc. …”
    Get full text
    Final Year Project (FYP)