Showing 681 - 700 results of 909 for search '((peng OR (shing OR pinggge)) OR (((pink OR pick) OR sspinna) OR pin))', query time: 0.14s Refine Results
  1. 681
  2. 682
  3. 683
  4. 684

    21W.730-2 Expository Writing - Food for Thought: Writing and Reading about Food and Culture, Fall 2005 by Boiko, Karen

    Published 2005
    “…The chef is an artist, yet those who pick oranges or process meat may be little more than slaves. …”
    Get full text
    Learning Object
  5. 685

    Managing commute traffic : from parking provision with ride-sourcing to work hours arrangements considering household travels by Su, Qida

    Published 2019
    “…Furthermore, in view of the prevailing household travels with multiple trip purposes (e.g., daycare drop-off/pick-up) in peak hours, we incorporate such household travels into the work starting time choice model. …”
    Get full text
    Get full text
    Thesis
  6. 686
  7. 687
  8. 688

    Organic donor-acceptor cocrystals for multiferroic applications by Wang, Zongrui, Zhang, Qichun

    Published 2021
    “…The cocrystallization strategy has provided an efficient route to fulfill room temperature magnetoelectricity in single phase owing to the long-range ordered π-π stacking (donor-acceptor assembled) network, long-lived excitons (with μs lifetime), spin orders (±1/2 s pin) and charge transfer (CT) dipoles in the assembled crystal lattice. …”
    Get full text
    Journal Article
  9. 689

    The Portevin-Le Chatelier effect of Cu-2.0Be alloy during hot compression by Zhu, Daibo, Wu, Na, Liu, Yang, Liu, Xiaojin, Jiang, Chaohua, Jiang, Yanbin, Zhao, Hongyun, Cui, Shuhui, Xie, Guilan

    Published 2023
    “…As the strain rate increases, the dislocations outpace the diffusion speed of the solute atoms, limiting their ability to effectively pin the dislocations, resulting in lower dislocation density and serration amplitude. …”
    Get full text
    Journal Article
  10. 690

    Compatability and equilibrium approach to slender concrete column design (dual project) by Toh, Yi Hui

    Published 2017
    “…This report evaluates and compares the proposed design method with the Australian code AS3600-2001 for slender concrete column. The failure loads of pin-end columns under short term loading and uniaxial bending are used as a pre-determined factor to analyse the data. …”
    Get full text
    Final Year Project (FYP)
  11. 691
  12. 692
  13. 693
  14. 694
  15. 695
  16. 696
  17. 697

    Beyond Color: Lattice Gauge Theory for Strongly-Coupled Physics by Oare, Patrick R.

    Published 2024
    “…The presented reconstruction method uses the analytic properties of the retarded Green’s function to constrain the full set of spectral functions that may be reconstructed from LGT data using the Nevanlinna-Pick interpolation problem. Next, two theories will be numerically studied using LGT. …”
    Get full text
    Thesis
  18. 698

    Moho complexity in Southern California revealed by local PmP and teleseismic Ps waves by Li, Tianjue, Yao, Jiayuan, Wu, Shucheng, Xu, Mijian, Tong, Ping

    Published 2022
    “…To well constrain the Moho geometry, we have developed a two-stage process to pick PmP waves and have created a reliable PmP travel time data set with a total of 10,192 picks. …”
    Get full text
    Journal Article
  19. 699

    Reinforcement learning for robot assembly by Vuong Quoc Nghia

    Published 2024
    “…Robotic systems are traditionally employed in manufacturing to automate repetitive tasks such as welding, painting, and pick-and-place. Despite tremendous progress in robotics research, the classical assembly skill remains a challenge. …”
    Get full text
    Thesis-Doctor of Philosophy
  20. 700