Showing 1,781 - 1,800 results of 2,898 for search '((pinnae OR pine) OR (bina OR ((ping OR (ming OR min)) OR (ling OR ssping))))', query time: 0.22s Refine Results
  1. 1781
  2. 1782
  3. 1783
  4. 1784

    Kinetics of papaya pectinesterase by Fayyaz, A., Asbi, B.A., Ghazali, H.M., Che Man, Y.B., Jinap, S.

    Published 1995
    “…The activity was linear up to 20 min with an enzyme concentration of up to 6.14 μg. …”
    Get full text
    Article
  5. 1785
  6. 1786
  7. 1787
  8. 1788
  9. 1789
  10. 1790

    Lying and rumination time as predictors of subclinical ketosis, metritis, and hypocalcaemia in dairy cows during the periparturient period: A systematic review and meta-analysis by Sadiq, Mohammed B., Zaini, Syamira-Syazuana, Shaik Mossadeq, Wan Mastura, Ramanoon, Siti Zubaidah, Syed-Hussain, Sharifah Salmah

    Published 2024
    “…Meanwhile, the MD of RT was significantly different in both periods (MD = −61.76 and −73.33 min/day, P < 0.05) for SCK and during the prepartum for metritis (MD = −23.37 min/day, P = 0.04). …”
    Get full text
    Article
  11. 1791

    Video summarization by Cheong, Shao Qiang.

    Published 2011
    Get full text
    Final Year Project (FYP)
  12. 1792
  13. 1793
  14. 1794
  15. 1795

    Dated by Ho, Jia Fen

    Published 2016
    “…Dated is a 2D hand drawn animation film done by Tan Ping Hao, Melissa Sing, Wang Jia Ying and myself. …”
    Get full text
    Final Year Project (FYP)
  16. 1796

    Compressive strength of cemented sand by Chong, Ying Jie.

    Published 2013
    “…In this paper, the four main factors affecting the compressive strength of cemented sand will be investigated: water-cement ratio of 0.5, 0.6, 0.7; sand-cement ratio of 4.0, 5.0, 6.0; curing age at 3, 7 and 28 days; strain rate of 0.5mm/min, 1.0mm/min, and 2.0 mm/min. The other factors such as dry density, sample dimensions (height and diameter), curing conditions were kept constant. …”
    Get full text
    Final Year Project (FYP)
  17. 1797
  18. 1798
  19. 1799

    Combinatorial algorithms for scheduling jobs to minimize server usage time by Ren, Runtian

    Published 2018
    “…This thesis is concerned with three combinatorial optimization problems for job scheduling, named the MinUsageTime Dynamic Bin Packing problem, the Energy-Efficient Job Scheduling problem and the Flexible Job Scheduling problem. …”
    Get full text
    Get full text
    Thesis
  20. 1800

    Investigation on frosting and defrosting performance of superhydrophobic metal additively manufactured materials by Yew, Yun Chian

    Published 2024
    “…However, between etching time of 10 min and 15 min, there is no significant difference in the frost retardation rate of AM metal. …”
    Get full text
    Final Year Project (FYP)