Showing 501 - 520 results of 647 for search '((pinnae OR ping) OR (((spinn OR (pingk OR spingk)) OR (spinae OR espinar)) OR pin))', query time: 0.16s Refine Results
  1. 501
  2. 502
  3. 503
  4. 504
  5. 505

    Design and implementation of an ultra sound distance estimation device by Ng, Waylon Wei Lun.

    Published 2013
    “…The most common type of ultrasonic distance measurement device uses the parallax ping where the signal is transmitted from the ultrasonic transmitter to the target and back to the ultrasonic receiver. …”
    Get full text
    Final Year Project (FYP)
  6. 506
  7. 507
  8. 508
  9. 509
  10. 510
  11. 511
  12. 512
  13. 513
  14. 514

    Organic donor-acceptor cocrystals for multiferroic applications by Wang, Zongrui, Zhang, Qichun

    Published 2021
    “…The cocrystallization strategy has provided an efficient route to fulfill room temperature magnetoelectricity in single phase owing to the long-range ordered π-π stacking (donor-acceptor assembled) network, long-lived excitons (with μs lifetime), spin orders (±1/2 s pin) and charge transfer (CT) dipoles in the assembled crystal lattice. …”
    Get full text
    Journal Article
  15. 515

    The Portevin-Le Chatelier effect of Cu-2.0Be alloy during hot compression by Zhu, Daibo, Wu, Na, Liu, Yang, Liu, Xiaojin, Jiang, Chaohua, Jiang, Yanbin, Zhao, Hongyun, Cui, Shuhui, Xie, Guilan

    Published 2023
    “…As the strain rate increases, the dislocations outpace the diffusion speed of the solute atoms, limiting their ability to effectively pin the dislocations, resulting in lower dislocation density and serration amplitude. …”
    Get full text
    Journal Article
  16. 516

    Compatability and equilibrium approach to slender concrete column design (dual project) by Toh, Yi Hui

    Published 2017
    “…This report evaluates and compares the proposed design method with the Australian code AS3600-2001 for slender concrete column. The failure loads of pin-end columns under short term loading and uniaxial bending are used as a pre-determined factor to analyse the data. …”
    Get full text
    Final Year Project (FYP)
  17. 517
  18. 518
  19. 519
  20. 520