-
1
-
2
-
3
-
4
Ensuring legitimate project-level claims about net biodiversity outcomes
Published 2024“…However, we explain why such indirect benefits should not contribute towards the accounting of project-level net biodiversity outcomes and provide guidance on the steps needed to legitimately claim no-net-loss of biodiversity.…”
Journal article -
5
Management of an instructional multimedia project: the macro-level implementation of the ADDIE model, and lessons learnt
Published 2008“…This dissertation will answer the above questions and also, present the use of an instructional model - ADDIE - at the macro-level in managing the project through the generation of a project specifications report.…”
Get full text
Thesis -
6
Analysis of the delay of A380 project from project management perspective.
Published 2010“…Project delay problem has been researched for years and achieved many important results, but investigation of mega project delay was not at that level. …”
Get full text
Thesis -
7
Multi-level robot management
Published 2020“…The report documents the development process and progress of the project. Analysis on different components of the software system was conducted, based on criteria such as performance, time required for development and level of integration possible with third party libraries. …”
Get full text
Final Year Project (FYP) -
8
Predicting marsh vulnerability to sea-level rise using Holocene relative sea-level data
Published 2018“…Tidal marshes rank among Earth’s vulnerable ecosystems, which will retreat if future rates of relative sea-level rise (RSLR) exceed marshes’ ability to accrete vertically. …”
Get full text
Get full text
Journal Article -
9
Charge-recycling multi-level convertor
Published 2015“…During these years, reducing the power lose and increasing efficiency has been the objective of many studies. In this project, a Charge-Recycling Multi-Level Convertor is designed and simulated. …”
Get full text
Final Year Project (FYP) -
10
Quantifying damage level to concrete specimens
Published 2013“…With the damage level quantified, future research continuing from this part of the project would use these values to correlate it to the event of breakup upon impacting the ground through experimental investigation.…”
Get full text
Final Year Project (FYP) -
11
-
12
Climate projections for Himalaya–Tibetan Highland
Published 2024“…The MM8 also shows an improved annual cycle of Tas and precipitation over the HTH, accompanied by a better representation of mid-tropospheric temperatures and upper-level anticyclone. The MM8 was considered to perform the future projections, it is noted that the future projections show a widespread warming of 0.6–0.9°C decade−1 and an increased precipitation of 0.3–0.5 mm day−1decade−1 across the Himalayan foothills and southeastern parts of HTH by the end of the twenty-first century under the worst case scenario (SSP585). …”
Get full text
Article -
13
Enhancing cost estimation performance through effective organizational control: the moderating role of project complexity in construction projects
Published 2024“…These results highlight the importance of effective organizational controls in achieving better cost estimation performance across various levels of project complexity. By implementing the right control modes, organizations can improve their cost estimation performance and enhance project success.…”
Get full text
Get full text
Article -
14
A survey on the level of computerisation in Singapore clinics
Published 2014Get full text
Final Year Project (FYP) -
15
Concept-level sentiment analysis in the manufacturing industry
Published 2020“…Sentiment analysis is the process of determining the opinion about a given subject from written or spoken language. This project aims to make use of concept-level sentiment analysis to develop and build a sentiment analysis knowledge base that is specialized in the Advanced Manufacturing and Engineering industry (AME) under the sixth technology plan in Singapore – the Research Innovation Enterprise (RIE) plan 2020. …”
Get full text
Final Year Project (FYP) -
16
The economic cost of sea level rise on Singapore
Published 2011Get full text
Final Year Project (FYP) -
17
A study of bank debt on an international level
Published 2013Get full text
Final Year Project (FYP) -
18
System-level design of low-carbon structures
Published 2024“…While the design space of wild data includes a diverse variety of projects, leveraging a synthetic dataset computed from a bottom-up parametric model helps produce insights specific to the design problem at hand. …”
Get full text
Get full text
Thesis -
19
-
20
Effect of minimum wage increase on employment and wage levels
Published 2021Get full text
Final Year Project (FYP)